Černíkov – construction of a pool (Q71788)

From EU Knowledge Graph
Revision as of 02:18, 29 October 2020 by DG Regio (talk | contribs) (‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Jump to navigation Jump to search
Project Q71788 in Czech Republic
Language Label Description Also known as
English
Černíkov – construction of a pool
Project Q71788 in Czech Republic

    Statements

    0 references
    472,452.7 Czech koruna
    0 references
    18,898.11 Euro
    10 January 2020
    0 references
    472,452.7 Czech koruna
    0 references
    18,898.11 Euro
    10 January 2020
    0 references
    100 percent
    0 references
    31 August 2020
    0 references
    xxx
    0 references
    0 references

    49°23'16.62"N, 13°3'30.17"E
    0 references
    34506
    0 references
    Výstavba průtočné tůně napouštěné z hlavního odvodňovacího zařízení v nezastavěném území obce Černíkov na trvalém travním porostu a neplodné půdě. (Czech)
    0 references
    Construction of a flow pool loaded from the main drainage facility in the unbuilt area of the village Černíkov on permanent grassland and barren soil. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.4.27/0.0/0.0/19_131/0010208
    0 references