FVE Povodí Vltavy Orlík (Q16660)

From EU Knowledge Graph
Revision as of 11:37, 25 February 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project aimed at reducing the energy dependency of the business operator. Within the scope of the project, the photovoltaic power plant for its own use of the branch of the Povodí Vltavy in the municipality of Mirleov is being absorbed. The FVE is designed as a renewable resource to reduce the actual consumption of the establishment from the distribution network. The proposed FVE is composed of 100 units of solar panels with a total installe...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
FVE Povodí Vltavy Orlík
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    408,152.99 Czech koruna
    0 references
    16,326.1196 Euro
    10 January 2020
    0 references
    680,254.99 Czech koruna
    0 references
    27,210.1996 Euro
    10 January 2020
    0 references
    59.9999994119852 percent
    0 references
    31 December 2019
    0 references
    Povodí Vltavy, státní podnik
    0 references

    50°4'11.50"N, 14°22'51.56"E
    0 references

    50°4'6.46"N, 14°23'8.41"E
    0 references
    15000
    0 references
    Náplní projektu zaměřeného na snížení energetické závislosti podnikatelského subjektu. V rozsahu tohoto projektu je navřena fotovoltaická elektrárna pro vlastní spotřebuv areálu pobočky Povodí Vltavy v obci Milešov. FVE je navržena jako obnovitelný zdroj pro snížení vlastní spotřeby provozovny z distribuční sítě. Navržená FVE je tvořena 100 ks solárních panelů o celkovém instalovaném výkon elektrárny je 27 kWp. a. (Czech)
    0 references
    The project aimed at reducing the energy dependency of the business operator. Within the scope of the project, the photovoltaic power plant for its own use of the branch of the Povodí Vltavy in the municipality of Mirleov is being absorbed. The FVE is designed as a renewable resource to reduce the actual consumption of the establishment from the distribution network. The proposed FVE is composed of 100 units of solar panels with a total installed capacity of 27 kWm. (English)
    0 references

    Identifiers

    CZ.01.3.10/0.0/0.0/17_138/0011663
    0 references