Reduction of energy intensity of Bechymen (Q72593)

From EU Knowledge Graph
Revision as of 21:53, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project deals with reducing the energy performance of the buildings of the secondary art school for teaching and education. The school building is located in the street.Písecká, on the land of Work No. 964 in the cadastral area of Bechyně [601543]. The proposed measures to reduce the energy performance of the building include complete insulation of the building envelope, installation of VZT with recuperation and implementation of energy mana...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Reduction of energy intensity of Bechymen
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    11,669,071.6 Czech koruna
    0 references
    466,762.86 Euro
    10 January 2020
    0 references
    29,172,679.0 Czech koruna
    0 references
    1,166,907.16 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    30 May 2018
    0 references
    29 October 2017
    0 references
    SUPŠ Bechyně
    0 references
    0 references

    49°18'22.54"N, 14°28'50.84"E
    0 references
    39165
    0 references
    Projekt řeší snížení energetické náročnosti budov střední uměleckoprůmyslové školy slouží pro výuku a vzdělávání. Budovy školy se nachází v ulici.Písecká, na pozemku prac. č. st. 964 v katastrálním území Bechyně [601543], . Navržená opatření pro snížení energetické náročnosti objektu zahrnují kompletním zateplení obálky budovy, instalaci VZT s rekuperací a zavedení energetického managementu. (Czech)
    0 references
    The project deals with reducing the energy performance of the buildings of the secondary art school for teaching and education. The school building is located in the street.Písecká, on the land of Work No. 964 in the cadastral area of Bechyně [601543]. The proposed measures to reduce the energy performance of the building include complete insulation of the building envelope, installation of VZT with recuperation and implementation of energy management. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/15_019/0001965
    0 references