D3 motorway, construction 0309/II Ševetín — Borek_1 (Q72376)

From EU Knowledge Graph
Revision as of 21:43, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emission...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
D3 motorway, construction 0309/II Ševetín — Borek_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    0 references
    907,441,408.54 Czech koruna
    0 references
    36,297,656.34 Euro
    10 January 2020
    0 references
    1,525,111,611.0 Czech koruna
    0 references
    61,004,464.44 Euro
    10 January 2020
    0 references
    59.5 percent
    0 references
    13 December 2016
    0 references
    18 August 2021
    0 references
    Ředitelství silnic a dálnic ČR
    0 references
    0 references

    50°2'57.91"N, 14°26'32.86"E
    0 references
    14000
    0 references
    Předmětem projektu je výstavba dálnice D3 v úseku 0309/II Ševětín - Borek. Jedná se o rozšíření stávající silnice I/3, která již byla vybudována jako poloviční profil dálnice, na dálniční profil kategorie D 27,5/120 v délce 10,680 km. Realizací výstavby dálnice D3 dojde k podstatnému zlepšení plynulosti dopravy a zvýšení bezpečnosti provozu. Z hlediska životního prostředí, plynulým provozem dojde ke snížení celkových emisí z dopravy v okolí stávající komunikace. (Czech)
    0 references
    The project is the construction of the D3 motorway in section 0309/II Ševětín – Borek. It is an extension of the existing road I/3, which has already been built as a half-profile motorway, to the motorway profile of category D 27,5/120 10.680 km long. The construction of the D3 motorway will significantly improve traffic flow and increase traffic safety. From an environmental point of view, continuous operation will reduce total traffic emissions in the vicinity of the existing road. (English)