Enlargement of the trolley transport operation in Jihlaves_1 (Q72007)

From EU Knowledge Graph
Revision as of 20:57, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project deals with the extension of environmental overhead transport in Jihlava. On the one hand, a completely new overhead contact line will be installed in Vrchlický Street and then modernised the existing overhead contact line due to the connection of this new overhead contact line (at trolleybus junctions). In connection with the new traction line it is also necessary to install the traction cable line., translated_summary)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Enlargement of the trolley transport operation in Jihlaves_1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    14,150,708.48 Czech koruna
    0 references
    566,028.34 Euro
    10 January 2020
    0 references
    16,664,832.33 Czech koruna
    0 references
    666,593.29 Euro
    10 January 2020
    0 references
    84.91 percent
    0 references
    1 September 2017
    0 references
    30 November 2017
    0 references
    30 November 2017
    0 references
    Dopravní podnik města Jihlavy, a.s.
    0 references
    0 references

    49°24'8.78"N, 15°35'7.22"E
    0 references
    58601
    0 references
    Projekt řeší rozšíření ekologické trolejové dopravy v Jihlavě. Dojde jednak k instalaci zcela nového trakčního trolejového vedení v ulici Vrchlického a dále pak k modernizaci stávajícího trolejového vedení v důsledku napojení tohoto nového trakčního vedení (u trolejbusových křižovatek). V souvislosti s novým trakčním vedením je nutná i instalace trakčního kabelového vedení. (Czech)
    0 references
    The project deals with the extension of environmental overhead transport in Jihlava. On the one hand, a completely new overhead contact line will be installed in Vrchlický Street and then modernised the existing overhead contact line due to the connection of this new overhead contact line (at trolleybus junctions). In connection with the new traction line it is also necessary to install the traction cable line. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.04.1.40/0.0/0.0/15_024/0000095