INSULATION OF THE BUILDING ENVELOPE SOKOLNY (Q72939)

From EU Knowledge Graph
Revision as of 20:50, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In o...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
INSULATION OF THE BUILDING ENVELOPE SOKOLNY
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    883,009.62 Czech koruna
    0 references
    35,320.38 Euro
    10 January 2020
    0 references
    2,207,524.06 Czech koruna
    0 references
    88,300.96 Euro
    10 January 2020
    0 references
    40.0 percent
    0 references
    3 November 2017
    0 references
    31 January 2020
    0 references
    Obec Lesonice
    0 references
    0 references
    0 references

    49°5'31.63"N, 15°45'9.54"E
    0 references
    67544
    0 references
    Záměrem projektu je snížení energetické náročnosti budovy sokolovny a snížení provozních nákladů. Projekt řeší zateplení obvodového pláště budovy certifikovaným kontaktním zateplovacím systémem. Dále bude provedena výměna nevyhovujících dřevěných oken a dveří za plastové s izolačním dvojsklem. V rámci projektu bude provedeno zateplení půdy a zateplení podlah v sociálním zařízení. K dosažení tohoto záměru bude zavedení energetického mamagemtu. (Czech)
    0 references
    The aim of the project is to reduce the energy performance of the Sokolovna building and to reduce operating costs. The project solves insulation of the building’s perimeter shell by a certified contact insulation system. In addition, the non-compliant wooden windows and doors will be replaced with plastic with insulating double glazing. As part of the project, soil insulation and floor insulation in sanitary facilities will be carried out. In order to achieve this, there will be the introduction of an energy mammoth. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/16_039/0004408
    0 references