Continuation of the footpath for pedestrians and cyclists in ZábGreek Lhota (Q63287)

From EU Knowledge Graph
Revision as of 13:18, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The construction of the pedestrian and cyclist trail is designed in the village Zářecká Lhota (intravilán of the village), in the cadastral territory of Zářecká Lhota (791024). The proposed trail leads along the II. Class II/315 road and begins with a connection to the existing cycle path leading on the right side from Chocně. The trail ends with a downhill on a purpose-oriented road behind the village. It is the construction of a new path for p...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Continuation of the footpath for pedestrians and cyclists in ZábGreek Lhota
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,871,500.0 Czech koruna
    0 references
    74,860.0 Euro
    1 October 2020
    0 references
    1,970,000.0 Czech koruna
    0 references
    78,800.0 Euro
    1 October 2020
    0 references
    95 percent
    0 references
    30 September 2020
    0 references
    Obec Zářecká Lhota
    0 references
    0 references

    50°0'15.8"N, 16°13'9.8"E
    0 references
    56501
    0 references
    Stavba stezky pro chodce a cyklisty je navržena v obci Zářecká Lhota (intravilán obce), na katastrálním území Zářecká Lhota (791024). Navržená stezka vede podél silnice II. třídy II/315 a začíná napojením na stávající cyklostezku vedoucí po pravé straně směrem od Chocně. Stezka končí sjezdem na účelovou komunikaci za obcí. Jedná se o výstavbu nové stezky pro chodce a cyklisty napojené na stávající stezku v obci Zářecká Lhota. (Czech)
    0 references
    The construction of the pedestrian and cyclist trail is designed in the village Zářecká Lhota (intravilán of the village), in the cadastral territory of Zářecká Lhota (791024). The proposed trail leads along the II. Class II/315 road and begins with a connection to the existing cycle path leading on the right side from Chocně. The trail ends with a downhill on a purpose-oriented road behind the village. It is the construction of a new path for pedestrians and cyclists connected to the existing trail in Zařecká Lhota. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.4.59/0.0/0.0/16_038/0009670
    0 references