Jíva Municipal sewerage system (Q60334)

From EU Knowledge Graph
Revision as of 12:13, 23 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project deals with the construction of a sewage sewerage in the village of Jívová. The sewage water will be converted through the gravitational sewer system and, to the extent necessary, by pressure sewerage to a new mechanical-biological sewage treatment plant with a capacity of 650 EO. The WWTP is designed according to the latest available BAT technologies. The purpose of the construction is to improve living conditions in the given locati...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Jíva Municipal sewerage system
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    41,762,725.43 Czech koruna
    0 references
    1,670,509.02 Euro
    10 January 2020
    0 references
    65,510,157.55 Czech koruna
    0 references
    2,620,406.30 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    23 April 2018
    0 references
    22 May 2019
    0 references
    31 October 2020
    0 references
    Obec Jívová
    0 references
    0 references
    0 references

    49°39'54.68"N, 17°20'17.81"E
    0 references
    78316
    0 references
    Projekt řeší výstavbu splaškové kanalizace v obci Jívová. Splaškové vody budou převedeny gravitační kanalizační soustavou a v nezbytné míře i tlakovou kanalizací na novou mechanicko-biologickou čistírnu odpadních vod s kapacitou 650 EO. ČOV je navržena podle nejmodernějších dostupných technologií BAT. Účelem stavby je zlepšení životních podmínek v dané lokalitě a zamezení kontaminace podzemních vod vodami splaškovými. (Czech)
    0 references
    The project deals with the construction of a sewage sewerage in the village of Jívová. The sewage water will be converted through the gravitational sewer system and, to the extent necessary, by pressure sewerage to a new mechanical-biological sewage treatment plant with a capacity of 650 EO. The WWTP is designed according to the latest available BAT technologies. The purpose of the construction is to improve living conditions in the given location and prevent groundwater contamination by sewage water. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004714
    0 references