Rescue and utilisation of the monastery convent in Chotěšov (Q59997)

From EU Knowledge Graph
Revision as of 23:18, 28 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q59997 in Czech Republic
Language Label Description Also known as
English
Rescue and utilisation of the monastery convent in Chotěšov
Project Q59997 in Czech Republic

    Statements

    0 references
    53,986,358.55 Czech koruna
    0 references
    2,159,454.34 Euro
    1 October 2020
    0 references
    63,513,363.0 Czech koruna
    0 references
    2,540,534.52 Euro
    1 October 2020
    0 references
    85 percent
    0 references
    28 January 2016
    0 references
    30 November 2020
    0 references
    Obec Chotěšov
    0 references
    0 references

    49°39'19.1"N, 13°12'12.6"E
    0 references
    33214
    0 references
    Projekt se týká obnovy konventu kláštera v Chotěšově. Úpravy se týkají části 1.NP, obnovy zpřístupnění průchodu do vnitřního dvora, opravy schodiště do 2.NP a úpravy v úrovni 2.NP, obnova fasády a jižní zahrady. V havarijním stavu je kanalizační systém a dochází k destrukci kleneb ve 2.NP včetně trhlin na fasádě. V 1.NP zůstane muzeum (bude realizována nová expozice), s výstavní expozicí barokní soch. Bude vybudováno sociálního zařízení v 1NP i 2.NP. 1. a 2.NP bude propojeno výtahem. (Czech)
    0 references
    The project concerns the restoration of the monastery convent in Chotěšov. The modifications concern part of the 1st floor, renewal of the entrance to the inner courtyard, repairs of the staircase to the 2nd floor and modifications in the level of 2nd floor, reconstruction of the façade and southern garden. The sewer system is in an emergency state and the vaults are destroyed in the 2nd floor including cracks on the façade. The museum will remain in the 1st floor (a new exposition will be realised), with an exhibition exhibition of Baroque sculptures. Social facilities in 1NP and 2NP will be built. The 1st and 2nd floor will be connected by lift. (English)
    23 October 2020
    0 references

    Identifiers

    CZ.06.3.33/0.0/0.0/15_015/0000336
    0 references