Superstructure and building modifications of the Starmon corporate background (Q14157)

From EU Knowledge Graph
Revision as of 15:58, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The building is located in Chocni. It is a coarse construction in which the original owners planned to operate the tire service. The building is a separate ground floor building, which is built on concrete foundations. There is no plaster, no tiles, significantly damaged windows.The reconstruction of the building will increase the utility area of the building. The building is designed in brick construction technology from ceramic blocks. The rec...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Superstructure and building modifications of the Starmon corporate background
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,541,721.53 Czech koruna
    0 references
    141,668.86 Euro
    10 January 2020
    0 references
    10,119,204.38 Czech koruna
    0 references
    404,768.18 Euro
    10 January 2020
    0 references
    35.0 percent
    0 references
    7 September 2015
    0 references
    14 November 2016
    0 references
    31 December 2016
    0 references
    STARMON s.r.o.
    0 references

    50°0'15.70"N, 16°13'9.73"E
    0 references
    56501
    0 references
    Objekt se nachází v Chocni. Jedná se o hrubou stavbu, ve které bylo původními majiteli plánováno provozování pneuservisu. Objekt je samostatně stojící přízemní budova, která je postavena na betonových základech. Není provedena omítka, chybí obklady, výrazně poškozená okna.Rekonstrukcí stavby dojde k navýšení užitné plochy budovy. Objekt je navržen v technologii zděné výstavby z keramických tvárnic. Zrekonstruovaná stavba bude sloužit jako dílna pro elektromontážní práce pro kolejovou dopravu. a. (Czech)
    0 references
    The building is located in Chocni. It is a coarse construction in which the original owners planned to operate the tire service. The building is a separate ground floor building, which is built on concrete foundations. There is no plaster, no tiles, significantly damaged windows.The reconstruction of the building will increase the utility area of the building. The building is designed in brick construction technology from ceramic blocks. The reconstructed construction will serve as a workshop for electrical installation work for rail transport. a. (English)