Building modifications of the building for the purpose of changing use to st.parc.no.115/1 (Q14334)

From EU Knowledge Graph
Revision as of 15:43, 22 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The object of the project is the reconstruction of the originally agricultural construction into the production and storage space of the contracting authority. Building modifications will not increase the single-storey existing building, there will be only minor changes in the interior and the layout changes? change of the purpose of individual rooms. After the construction modifications have been carried out, the building is divided into two ba...)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Building modifications of the building for the purpose of changing use to st.parc.no.115/1
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    3,961,044.67 Czech koruna
    0 references
    158,441.79 Euro
    10 January 2020
    0 references
    8,802,321.49 Czech koruna
    0 references
    352,092.86 Euro
    10 January 2020
    0 references
    45.0 percent
    0 references
    21 November 2016
    0 references
    18 December 2017
    0 references
    31 December 2017
    0 references
    PVC OKNA s.r.o.
    0 references
    0 references

    49°35'19.90"N, 18°22'12.25"E
    0 references
    73911
    0 references
    Předmětem proejktu je rekonstrukce původně zemědělské stavby na výrobní a skladovací prostory zadavatele. Stavebními úpravami nedojde ke zvětšení jednopodlažního stávajícího objektu, bude docházet pouze k drobným změnám v interiéru a úpravě dispozice ? změně účelů jednotlivých místností. Po provedení stavebních úprav se objekt rozdělí do dvou základních částí ? zázemí pro zaměstnance, výrobní hala a expedice. Jako zázemí pro zaměstnance bude vytvořena denní místnost, šatna, sprchy a WC. a. (Czech)
    0 references
    The object of the project is the reconstruction of the originally agricultural construction into the production and storage space of the contracting authority. Building modifications will not increase the single-storey existing building, there will be only minor changes in the interior and the layout changes? change of the purpose of individual rooms. After the construction modifications have been carried out, the building is divided into two basic parts: facilities for employees, production hall and expedition. As a background for employees will be created day room, dressing room, showers and toilet. a. (English)
    22 October 2020
    0 references

    Identifiers

    CZ.01.2.07/0.0/0.0/16_058/0007674
    0 references