Construction of a photovoltaic farm Zacisze I with a capacity of up to 1 MW together with the necessary technical infrastructure and connection to the power grid in Mirosławiec (Q137743)

From EU Knowledge Graph
Revision as of 20:08, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q137743 in Poland
Language Label Description Also known as
English
Construction of a photovoltaic farm Zacisze I with a capacity of up to 1 MW together with the necessary technical infrastructure and connection to the power grid in Mirosławiec
Project Q137743 in Poland

    Statements

    0 references
    1,019,403.74 zloty
    0 references
    244,656.90 Euro
    13 January 2020
    0 references
    1,456,291.07 zloty
    0 references
    349,509.86 Euro
    13 January 2020
    0 references
    70.0 percent
    0 references
    11 January 2019
    0 references
    30 June 2019
    0 references
    ES JARSZEWO SPÓŁKA Z O.O.
    0 references
    0 references
    Przedmiotem projektu jest budowa farmy fotowoltaicznej o mocy do 1 MW w miejscowości Mirosławiec na działkach o ew. nr 244 i 245. Projekt ma charakter stacjonarny i będzie składał się z jednego etapu polegającego na budowie farmy. W ramach realizacji projektu Wnioskodawca dokona zakupu instalacji fotowoltaicznej z niezbędnymi elementami, tj. konstrukcji do paneli fotowoltaicznych, paneli fotowoltaicznych oraz inwerterów. Zgodnie z aktualnym projektem planuje się zainstalowanie 3190 sztuk paneli, każdy o mocy 265W, tj. 3190x265W=845350 W. W związku z faktem, iż fotowoltaika jest relatywnie nową dziedziną, w stałym procesie rozwoju i udoskonalania, Wnioskodawca dopuszcza zmianę zainstalowanej mocy tak, aby nie przekroczyła ona 1 MW, a zatem ilość i moc poszczególnych paneli fotowoltaicznych może ulec zmianie. Na dzień składania wniosku planuje się mocy zainstalowaną równą 0,845 MW. Taka zmiana wynikałaby ze stale trwających prac dot. zwiększenia produktywności i efektywności paneli (np. W ciągu ostatnich dwóch lat standardowy panel dostępny na rynku zmienił swój parametr określający moc z wartości 230W na 250W, nie zmieniając tym samym wymiarów panela). Ponadto w celu rozpoczęcia produkcji energii elektrycznej Wnioskodawca zaplanował prace w obrębie infrastruktury elektrycznej: instalacja wewnętrzna nN - trasy kablowe; instalacja zewnętrzna SN - trasa kablowa, komunikacja; łączność, telemechanika; stacja transformatorowo - rozdzielcza, pozostała infrastruktura elektroenergetyczna. Projekt obejmuje też wydatki związane z informację i promocją, ogrodzeniem, systemem alarmowym i monitoringiem i in. W wyniku projektu Wnioskodawca rozpocznie produkcję energii elektrycznej ze słońca, dzięki czemu możliwe będzie osiągnięcie określonych w we wniosku wskaźników rezultatu. Na dzień składania wniosku Wnioskodawca dysponuje niemal wszystkimi niezbędnymi zezwolenia do rozpoczęcia inwestycj (Polish)
    0 references
    The subject of the project is the construction of a photovoltaic farm with a capacity of up to 1 MW in Mirosławiec on plots of 244 and 245. The project is stationary and will consist of one stage of the construction of a farm. As part of the project, the applicant will purchase a photovoltaic installation with the necessary elements, i.e. structures for photovoltaic panels, photovoltaic panels and inverters. According to the current project, 3190 panels are planned to be installed, each with a capacity of 265 W, i.e. 3190x265W=845350 W. Due to the fact that photovoltaics is a relatively new field, in a continuous process of development and improvement, the applicant accepts a change of installed power so that it does not exceed 1 MW, and therefore the amount and power of individual photovoltaic panels may change. At the date of application, a capacity of 0,845 MW is planned. Such a change would result from ongoing work on increasing productivity and efficiency of panels (e.g. Over the last two years, the standard panel available on the market has changed its power parameter from 230 W to 250 W without changing the dimensions of the panel). In addition, in order to start the production of electricity, the applicant planned works within the electricity infrastructure: internal installation nN – cable routes; external installation of SN – cable route, communication; communication, telemechanics; transformer-resolution station, remaining power infrastructure. The project also covers expenditure related to information and promotion, fence, alarm system and monitoring, etc. As a result of the project, the applicant will start producing electricity from the sun, so that the result indicators specified in the proposal can be achieved. At the date of submission of the application, the applicant shall have almost all the necessary permits to start the investment (English)
    21 October 2020
    0 references

    Identifiers

    RPZP.02.10.00-32-B044/17
    0 references