Integration of the public transport system through the construction of a bicycle path from the transport hub of Goleniów Industrial Park to the system of cycle paths towards the railway station “Goleniów” (Q137543)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Integration of the public transport system through the construction of a bicycle path from the transport hub of Goleniów Industrial Park to the system of cycle paths towards the railway station “Goleniów” |
Project in Poland financed by DG Regio |
Statements
2,125,000.0 zloty
0 references
3,816,538.76 zloty
0 references
55.68 percent
0 references
1 July 2019
0 references
31 December 2020
0 references
GMINA GOLENIÓW
0 references
Analizowane zadanie pn.: „Integracja systemu transportu publicznego poprzez budowę ścieżki pieszo-rowerowej od węzła komunikacyjnego Goleniów Park Przemysłowy do systemu ścieżek pieszo-rowerowych w kierunku Dworca Kolejowego „Goleniów”” obejmuje swoim zakresem: 1. Przebudowę ul. Prostej w Łozienicy polegającej na: 1.1. budowie ścieżki pieszo-rowerowej z połączeniem z istniejącą ścieżką na ul. Nowej, 1.2. wykonaniu przepustów na ciekach, 1.3. modernizacji peronów autobusowych, dojść dla pieszych (koszt niekwalifikowany), 1.4. wykonaniu stałej organizacji ruchu. 2. Przebudowę ul. Granitowej w Łozienicy polegającej na: 2.1. budowie ścieżki pieszo-rowerowej z połączeniem z planowanym do realizacji w ramach SKM węzłem przesiadkowym, 2.2. poszerzeniu pasa drogowego, wykonaniu rowu odparowującego. 3. Wykonanie oświetlenia w ciągu projektowanej ścieżki. - - - Etapy realizacji: - Wybór Wykonawcy dokumentacji projektowej oraz robót w formule „zaprojektuj i wybuduj”: 2-3 kw. 2019, - Uzyskanie decyzji ZRID: 1 kw. 2020, - Usługi: Inżynier Projektu i Nadzór Inwestorski [koszt poza projektem]: 2 kw. 2020 – 4 kw. 2020, - Roboty budowlane: 2 kw. 2020 – 4 kw. 2020, - Promocja projektu [koszt poza projektem]: 4 kw. 2020, - Odbiór końcowy: 4 kw. 2020. - - - Wnioskodawca posiada w ramach opisanych struktur majątkowo-administracyjnych zasoby techniczne, kadrowe i wiedzę gwarantujące uruchomienie infrastruktury bezpośrednio po zakończeniu projektu (SW 3.2). Projekt będzie realizowany za pomocą Zespołu ds. Wdrażania Projektu oraz podmiotów zew. (SW 3.2.2) - - - Zgodność projektu z zapisami pkt 1.2 Regulaminu naboru: - typ projektu – 1, - inwestycja wskazana w Strategii i wdrażana na obszarze ZIT SOM, - wsparcie na działania usprawniające komunikację publiczną, - dotyczy obszaru, dla którego stworzony został PGN oraz PZMM (SW 2.2.7), - przedmiot projektu znajduje się na terenie strefy przemysłowej, - inwestycja powiązana z działaniami „miękkimi” w ramach PGN. (Polish)
0 references
The analysed task Mon: “Integration of the public transport system through the construction of a foot-bike path from the transport hub Goleniów Industrial Park to the system of foot-bike paths towards the railway station "Goleniów" includes its scope: 1. Redevelopment of St. A straight in Łozienica consisting of: 1.1. construction of a foot-bike path with connection to the existing path on ul. New, 1.2. execution of culverts on watercourses, 1.3. modernisation of bus platforms, walk for pedestrians (ineligible cost), 1.4. execution of permanent traffic organisation. 2. Redevelopment of St. Granite in Łozienica consisting of: 2.1. construction of a foot-bike path with a connection to the planned interchange node within SKM, 2.2. extension of the road lane, construction of evaporation ditch. 3. Illumination within the designed path. — – - The stages of implementation: — Selection of the Contractor of design documentation and works under the formula “design and build”: 2-3 sq. m. 2019, – Obtaining a ZRID decision: 1 sq. m. 2020, – Services: Project engineer and investor supervision [cost outside the project]: 2 sq. m. 2020-4 sq. m. 2020, – Construction works: 2 sq. m. 2020-4 sq. m. 2020, – Promotion of the project [cost outside the project]: 4 sq. m. 2020, – Final reception: 4 sq. m. 2020. — – - The applicant has, within the framework of the structures described, technical and administrative resources, staffing and knowledge to guarantee the commissioning of the infrastructure immediately after the completion of the project (SW 3.2). The project will be implemented with the help of the Team. Implementation of the Project and entities of the call. (SW 3.2.2) – - – Conformity of the project with the provisions of point 1.2 of the Rules of Procedure: — type of project – 1, – investment indicated in the Strategy and implemented in the area of ZIT SOM, – support for activities improving public communication, – concerns the area for which PGN and PZMM (SW 2.2.7) were created – the subject of the project is located in the industrial zone, – an investment linked to “soft” activities within PGN. (English)
21 October 2020
0 references
Identifiers
RPZP.02.02.00-32-0001/19
0 references