Land development together with the rehabilitation of the recreational pond in the village of Gęsiki with particular emphasis on ecological education and the protection of biodiversity (Q132516)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | Land development together with the rehabilitation of the recreational pond in the village of Gęsiki with particular emphasis on ecological education and the protection of biodiversity |
Project in Poland financed by DG Regio |
Statements
657,492.86 zloty
0 references
773,521.01 zloty
0 references
85.0 percent
0 references
31 July 2018
0 references
30 December 2020
0 references
GMINA BARCIANY
0 references
Teren realizacji Projektu położony jest we wsi Gęsiki , Gmina Barciany. Obszar opracowania – 1,39 ha, obejmuje działki nr 64, 131,141 obręb nr 15 Gęsiki. Działki są własnością Gm. Barciany. Zakres rzeczowy Projektu: 1. Bioróżnorodność - zagospodarowanie terenu: Gospodarka drzewostanem , Roślinność projektowana: sadzenie i pielęgnacja krzewów 65 szt. sadzenie drzew 47 szt. , obsadzenie terenu roślinami, w tym kwietniki 146 m2,.Łąka kwietna - 420 m2, utworzenie 2 szt. piaszczyste łachy (230 m2 + 290 m2) 2. Budowa ekologicznej ścieżki edukacyjnej: Ścieżka o nawierzchni z płyt beton. – 253,40 m2(181 mb x 1,40 szer.), wyposażenie oraz elem. edukacyjne: tablice inform. duże - szt. 3, tablice inform. małe -9szt., Altana - zielona klasa - szt. 1, pomost pływający z trapem-1szt. , ławki bez oparcia oraz ławki wraz placem -17szt. leżaki -5szt. kosze na śmieci -5szt.,luneta do obserwacji ptaków -1szt., rzeźby ze stali -7szt.(prezentujące gatunki zwierząt) ,tabliczki z nazwami gat. roślin – 60szt. Pozostałe elementy małej architektury: ul dla murarek, budka dla ptaków i nietoperzy -2szt.,pływająca platforma dla ptaków, stojaki na rowery -2szt., łodzie-siedziska przy pomoście -3szt. ,głazowisko z kamienia naturalnego - Wykonanie monitoring bezpieczeństwa (TIK). 3. Rekultywacja stawu rekreacyjnego : - Pogłębienie zbiornika wodnego wraz z wyprofilowaniem dna ( odwodnienie, oczyszczenie , roboty ziemne, karczowanie, skarpowanie i plantowanie nasypów) Szczegółowy zakres robót jest opisany w zał. nr 1 Studium wykonalności. Etapy realizacji Projektu: - etap przygotowawczy - opracowano dokument. techniczną i konkursową, - etap wyboru wykonawcy inwestycji - zgodnie z PZP realizacja inwestycji - wykonanie i odbiór robót, - końcowe rozliczenie rzeczowe i finansowe. Projekt wpisuje się w założenia SzOOP RPO WWM poprzez Cel szczegółowy:Lepsze mechanizmy ochrony bioróżnorodności w regionie - zachowując, zabezpieczając i zwiększając bioróżnorodność terenu objętego Projektem. (Polish)
0 references
The project is located in the village of Gęsiki, the municipality of Barciany. The area of development – 1,39 ha, includes plots no. 64, 131.141 ridge no. 15 Gooseki. The plots are owned by Gm. Barciana. Material scope of the Project: 1. Biodiversity – land use: Tree standing economy, Plant design: planting and care of shrubs 65 pcs. planting trees 47 pcs. Planting of the land with plants, including flowerbeds of 146 m²,.April meadow – 420 m², creation of 2 pieces of sandy rag (230 m² + 290 m²) 2. Building an ecological educational path: Paved pavement with concrete slabs. — 253,40 m²(181 mb x 1.40 w.), equipment and educational elements: information plates. large – pc. 3, plates inform. small -9pcs, Altana – green class – pc. 1, a floating platform with a trapdoor – 1pcs. Benches without backrest and benches with a square -17pcs. deck chairs -5pcs. rubbish baskets -5pcs, bird-watching telescopes -1pcs, steel sculptures -7pcs (representing animal species), tables with names of species of plants – 60pcs. Other elements of small architecture: hive for masons, birdhouse and bats -2pcs, floating bird platform, bike stands -2pcs, boats-sitting at the pier -3pcs. Natural stone boulder – Implementation of safety monitoring (ICT). 3. Recreational recreational pond restoration: — The depth of the water reservoir along with the profile of the bottom (dehydration, cleansing, earthworks, grubbing-up, grabbing and planting of embankments) Detailed scope of works is described in Appendix 1 of the feasibility study. Stages of Project Implementation: — preparatory stage – technical and competition document was prepared, – the stage of the selection of the contractor – according to the PZP the implementation of the investment – execution and receipt of works, – final settlement in kind and financial. The project fits into the assumptions of the SCOOP WWM RPO through the Specific Objective: Better mechanisms for protecting biodiversity in the region – preserving, safeguarding and increasing biodiversity in the Project area. (English)
21 October 2020
0 references
Identifiers
RPWM.05.03.00-28-0010/19
0 references