Comprehensive thermal modernisation of the residential building at ul. Topolowa 14 in Bania Mazurskie (Q132338)

From EU Knowledge Graph
Revision as of 19:28, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q132338 in Poland
Language Label Description Also known as
English
Comprehensive thermal modernisation of the residential building at ul. Topolowa 14 in Bania Mazurskie
Project Q132338 in Poland

    Statements

    0 references
    0 references
    357,082.56 zloty
    0 references
    85,699.81 Euro
    13 January 2020
    0 references
    440,897.1 zloty
    0 references
    105,815.3 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    7 March 2017
    0 references
    31 December 2020
    0 references
    WSPÓLNOTA MIESZKANIOWA „CZTERNASTKA" W BANIACH MAZURSKICH
    0 references
    0 references

    54°14'34.8"N, 22°2'38.8"E
    0 references
    Zakres prac obejmuje kompl. termomod. budynku położ. w miejsc.i Banie Mazurskie, w Gminie Banie Mazurskie. Budynek mieszkalny wielorodz. w konstr. trad. murow. posiada 3 kondygn. nadziemne w systemie OWT-67/SB/V. Pow. użytk. mieszkań - 1221,41 m2 W zakresie projektu zgodnie z audytem znajdują się następ. uspr. termomod.: •Inst. zaworów z głowicami termostatycznymi, •Wym. inst. oświetl. na klatkach schodowych, piwnicach i pralniach, w tym wymiana na energooszczędne typu LED, •Dociepl. ścian zewnętrzn. osłonowych i szczytowych nad ziemią, •Izolacja cieplna stropodachu, dociepl. stropu nad piwnicą, •Wym. stolarki okiennej zgodnie z wymog. RMI na 2021 r. •Nakładki na domofon w języku Braila, oznaczenia dla słabowidz. w kolorach kontrast. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozw. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inwestycji wdraż. będzie przez beneficj., który zapewnił zespół doświad. osób odpowiedz. za wdrożenie projektu, którzy posiad. wysokie kwalif. i doświadcz. w realiz. projektów wdroż. w latach 2007-2013, co potwierdza rozdział -sw. Przegrody budowlane budynków nie spełniają obecnie obowiąz. wymogów przenik. cieplnej. W wyniku realiz. projektu zmniejszona zostanie energochł. budynku objętego projektem na terenie Bań Mazurskich. Wykonane działania będą miały istotny wymiar w realizacji dokum. strateg. na poziomie region., krajowym oraz europ. - Gmina nie posiada PGN i LPR. Problem nie został wymyślony przez interes. - jest potrzebą potw. wykon. audytami energet., stwierdz. zasadność realizacji prac objętych projektem w celu zwiększ. efektyw. energet. budynku mieszk. Cel projektu jest zgodny z celami 4 osi prior. RPO WiM oraz SZOOP - Efekt. energ. Cel temat. 4 - wsp. przejścia na gosp. niskoem. we wszystkich sektorach - prioryt. inwest. 4c-wspieranie efekt. energ. ... - dzięki realiz. projektu zmniejszy się zużycie energii pierw. i zapot. na ciepło - r. 1.2 sw. (Polish)
    0 references
    The scope of works includes compl. thermomode. of the building located in places.i Banie Mazurskie, in the Municipality of Bana Mazurskie. The building has 3 floors above ground in the OWT-67/SB/V system. •Inst. valves with thermostatic heads, •Inst. illumination on stairways, cellars and laundry facilities, including replacement for energy-efficient LED type, •Temperature of exterior walls. shielded and peaked above the ground, •Heat insulation of stropodach, ceiling insulation above the cellar, •Vehicle of window carpentry according to the requirement. RMI for 2021 •Intercom covers in Braila, markings for weak colours contrast. For details on the scope of the item and accepted development can be found in chapter. 2.2 St. and in the techn. document extract annexed to the application. The whole range of investments in the implementation of the project will be through the beneficiary., which provided a team of experience. persons answer. for the implementation of the project, who possess. high qualified. and experience in the implementation of projects implemented in the years 2007-2013, which confirms the chapter -sw. Building partitions of buildings currently do not meet the requirements of heat transfer. As a result of the project, the energy efficiency of the building covered by the project will be reduced in the area of Bań Mazurskie. The actions carried out will have an important dimension in the implementation of the strategy at regional, national and European level. — The municipality does not have PGN and LPR. The problem wasn't invented by business. — is the need to perform energet audits, find the validity of the work covered by the project in order to increase. efficiencyw. energet. building bellow. The objective of the project is in line with the objectives of the 4 axis prior. RPO WiM and SZOOP – Effect. energ. Objective of the subject. 4 – communal transition to low-level operation in all sectors – prioritisation of investment. 4c-support effect. energ. ... — thanks to the project’s implementation, energy consumption first and heat contagion will be reduced – 1.2 sw. (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.02-28-0003/19
    0 references