Thermal modernisation of the building at ul. Żeromski 2B (Q132266)

From EU Knowledge Graph
Revision as of 17:01, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of the building at ul. Żeromski 2B
Project in Poland financed by DG Regio

    Statements

    0 references
    1,405,499.86 zloty
    0 references
    337,319.97 Euro
    13 January 2020
    0 references
    1,735,399.26 zloty
    0 references
    416,495.82 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    12 January 2017
    0 references
    31 December 2019
    0 references
    GMINA ELBLĄG
    0 references
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Projekt przewiduje kompleksową termomodernizację w budynku będącym własnością Gminy Elbląg, przy ul. Żeromskiego 2B. Projekt dotyczy budynku wykorzystywanego głównie na potrzeby w zakresie ochrony zdrowia. Budynek jest wpisany do rejestru zabytków pod numerem 242/92 dnia 24.12.1992 r Projekt można podzielić na dwa etapy tj: 1) Prace przygotowawcze – dokumentacja projektowa, audyt energetyczny, studium wykonalności 2) Prace termomodernizacyjne. Elementem projektu będzie także zatrudnienie inżyniera kontraktu oraz działania promocyjne Przyjęty wariant projektu zakłada przeprowadzenie następujących prac termomodernizacyjnych: 1) Modernizacja instalacji c.o. Modernizacja obejmuje poprawę sprawności przesyłu poprzez montaż izolacji na rurociągach przesyłowych, montaż zaworów termostatycznych z inteligentnymi głowicami . 2) Ocieplenie dachu budynku materiałem termoizolacyjnym. 3) Wymiana stolarki okiennej (wszystkich okien w obiekcie) na nową oszkloną szybą zespoloną podwójną. 4) Ocieplenie ścian zewnętrznych przy gruncie budynku materiałem termoizolacyjnym wraz z warstwą fakturową na siatce. 5) Wymiana stolarki drzwiowej ( wszystkie drzwi zewnętrzne) na nową oszkloną szybą zespoloną podwójną. 6) Ocieplenie wszystkich ścian zewnętrznych budynku przy użyciu materiału termoizolacyjnego: Natrysk poliuretanowy o grubości minimum: 3 cm. Ocieplenie ścian dotyczy wszystkich ścian zewnętrznych kondygnacji naziemnych. W ociepleniu uwzględniono modernizację cokołu. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Poddziałania 4.3.1 ponieważ w wyniku jego realizacji nastąpi zwiększanie efektywności energetycznej budynku, co jest zgodne z celami w/w działania. Ponadto projekt jest zgodny z oczekiwanymi efektami wsparcia dla Osi nr 4 tj: 1) Obniżeniem zużycia energii pierwotnej w budynkach publicznych i zapotrzebowania na ciepło w zabudowie mieszkaniowej. 2) Spadkiem emisji gazów cieplarnianych do atmosfery (Polish)
    0 references
    The project provides for a comprehensive thermal modernisation in a building owned by the Municipality of Elbląg, on ul. Zeromski 2B. The project concerns a building used mainly for health care purposes. The building is entered in the Register of Monuments on 242/92 on 24.12.1992 The project can be divided into two stages, i.e.: 1) Preparatory work – design documentation, energy audit, feasibility study 2) Thermomodernisation work. The project will also include hiring a contract engineer and promotional activities The chosen project option assumes the following thermo-modernisation works: 1) Modernisation of central heating installations. Modernisation includes improving transmission efficiency through installation of insulation on transmission pipelines, installation of thermostatic valves with intelligent heads. 2) Insulating the roof of the building with insulation material. 3) Replacement of window joinery (all windows in the building) with a new glazed double glazed glass. 4) Warming of the outer walls next to the ground of the building with insulating material together with an invoice layer on the grid. 5) Replacement of the door carpentry (all external doors) with a new glazed double glazed glass. 6) Warming of all exterior walls of the building using insulation material: Polyurethane spray with a minimum thickness: It’s 3 centimeters. Wall warming applies to all external walls of ground floors. The warming takes into account the modernisation of the pedestal. The project fits into the assumptions set out in the SzOOP RPO WiM for Sub-measure 4.3.1 as the result of its implementation will increase the energy efficiency of the building, which is consistent with the objectives of the above-mentioned action. In addition, the project complies with the expected support effects for Axis No 4, i.e.: 1) Reducing primary energy consumption in public buildings and the need for heat in housing. 2) Falling greenhouse gas emissions into the atmosphere (English)
    21 October 2020
    0 references

    Identifiers

    RPWM.04.03.01-28-0027/17
    0 references