No label defined (Q132167)

From EU Knowledge Graph
Revision as of 16:55, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    520,018.13 zloty
    0 references
    124,804.35 Euro
    13 January 2020
    0 references
    945,487.51 zloty
    0 references
    226,917.0 Euro
    13 January 2020
    0 references
    55.0 percent
    0 references
    19 December 2018
    0 references
    31 December 2019
    0 references
    DELUX PRZEWOZY TURYSTYCZNO-PASAŻERSKIE HANDEL-USŁUGI DELUGA KRZYSZTOF SPÓŁKA JAWNA
    0 references
    0 references

    54°15'20.9"N, 20°48'24.5"E
    0 references
    Przedmiotem projektu jest termomodernizacja budynku wraz z zamontowaniem pompy ciepła do produkcji energii cieplnej oraz instalacji fotowoltaicznej do produkcji energii elektrycznej. Usprawnienie stanu technicznego budynku przy ul. Kętrzyńskiej 64 w Bartoszycach zakłada ulepszenia w następującym zakresie: 1. Wymianę istniejącego oświetlenia w budynku na nowe w energooszczędnej technologii LED, 2. Ocieplenie dachu na istniejącą konstrukcje np. wełny mineralnej granulowanej 3. Wymiana wszystkich istniejących drzwi zewnętrznych na nowe przeszklone o współczynniku przenikania ciepła Umax=1,3 W/(m2*K), 4. Modernizacja systemu centralnego ogrzewania poprzez likwidację istniejących kotłów węglowych. Wykonanie nowego źródła ciepła –pompy ciepła powietrznej (monoblok) o mocy min. 80 kW wraz z źródłem szczytowym, wymiana instalacji grzewczej, 5. Ocieplenie dachu nad wiatrołapem poprzez ułożenie na istniejącą konstrukcje dodatkowej warstwy styropapy, 6. Wymiana istniejących okien i witryn w budynku na nowe o współczynniku przenikania ciepła Umax= 0,9 W/(m2*K), 7. Ocieplenie ścian podłużnych i szczytowych SZ1 i SZ2 poprzez dołożenie warstwy styropianu na istniejącą konstrukcje. Docieplenie wykonać na całej ścianie poniżej gruntu do głębokości min 50 cm poniżej poziomu gruntu., 8. Pomniejszenie otworów okiennych 9. Montaż elektrowni fotowoltaicznej o mocy ok. 23,5 kWp umieszczony na dachu budynku i skierowany maksymalnie w stronę południową. Instalacja zgodnie z możliwością opisaną w SzOOP będzie służyła potrzebom własnym ?rmy i będzie podłączona do sieci, jednak ze względu na moc instalacji (do 50 kW) zgodnie z art. 5 ust. o OZE (Dz.U. 2015 poz. 478) oraz Art. 7 ust. 8d ze znaczkiem 4-9 ustawy – Prawo energetyczne (Dz.U. Dz.U. 1997 nr 54 poz. 348) będzie ona dokonywana na podstawie zgłoszenia bez konieczności posiadania przez bene?cjenta ważnych technicznych warunków przyłączenia wszystkich ujętych w projekcie źródeł wytwarzania energii do sieci elektroenergetycznej. (Polish)
    0 references
    The subject of the project is the thermal modernisation of the building with the installation of a heat pump for the production of heat and photovoltaic installations for the production of electricity. Improvement of the technical condition of the building at ul. Kętrzyńska 64 in Bartoszyce assumes improvements in the following scope: 1. Replacement of existing lighting in the building for new in energy-saving LED technology, 2. Roof warming on existing structures, e.g. granulated mineral wool 3. Replacement of all existing external doors with new glazed heat transfer coefficient Umax = 1,3 W/(m²*K), 4. Modernisation of the central heating system by decommissioning existing coal boilers. Production of a new heat source – air heat pump (monoblock) with a power min. 80 kW with a peak source, replacement of heating system, 5. Warming the roof over the windmill by laying on existing structures an additional layer of styropapa, 6. Replacement of existing windows and windows in the building for new ones with a heat transfer coefficient Umax= 0,9 W/(m²*K), 7. Warming of the longitudinal and peak walls SZ1 and SZ2 by adding a layer of styrofoam to existing structures. Make warming on the whole wall below the ground to a depth of min. 50 cm below ground level., 8. Reduction of window openings 9. Installation of a photovoltaic power plant with approx. 23.5 kWp placed on the roof of the building and facing up to the south. The installation according to the possibility described in the SzOOP will serve the needs of the company and will be connected to the network, however due to the power of the installation (up to 50 kW) in accordance with Art. 5 par. on RES (Journal of Laws 2015 item. 478) and Article 7. 8d with stamp 4-9 of the Act – Energy Law (Journal of Laws, Journal of Laws 1997 No. 54, item. 348) it will be made on the basis of the notification without the need for the beneficiary to have important technical conditions for connecting all energy generation sources included in the project to the electricity grid. (English)
    21 October 2020