Renovation of the western facade and towers of the parish church of the Nativity N.M.P. in Piekoszów with adaptation to tourist functions (Q127828)

From EU Knowledge Graph
Revision as of 15:26, 21 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation of the western facade and towers of the parish church of the Nativity N.M.P. in Piekoszów with adaptation to tourist functions
Project in Poland financed by DG Regio

    Statements

    0 references
    499,952.0 zloty
    0 references
    119,988.48 Euro
    13 January 2020
    0 references
    1,139,103.0 zloty
    0 references
    273,384.72 Euro
    13 January 2020
    0 references
    43.89 percent
    0 references
    1 July 2017
    0 references
    30 June 2018
    0 references
    PARAFIA RZYMSKOKATOLICKA P.W. NARODZENIA NAJŚWIĘTSZEJ MARYI PANNY W PIEKOSZOWIE
    0 references
    0 references
    Realizacja projektu polegać będzie na wykonaniu prac renowacyjnych obejmujących: -remont więźby dachowej wież + inne (w tym roboty ciesielskie)-wg kosztorysu: rozebranie pokrycia i deskowania, nowe deskowanie, położenie membrany, wymiana elementów podłóg, odgrzybienie, montaż żaluzji, wykonanie i montaż witraża, konserwacja sztukaterii, remont stropów pośrednich drewnianych i konstrukcji wsporczych dzwonów; -wymiana pokrycia dachów wież + obróbki blacharskie: postawienie rusztowań, demontaż starego pokrycia, krycie wież i kopuł blachą, instalacje odgromowe, remont obróbek blacharskich; -remont tynków elewacji zachodniej i wież: roboty przygotowawcze, czyszczenie powierzchni, spoin, naprawa murów zabytkowych, uzupełnienie tynków, impregnacja preparatem przeciw pleśni, położenie tynków renowacyjnych (nakłady na pogrubienie, przetarcie szpachlą wapienną), wykonanie profili ciągnionych szlachetnych ozdobnych, gruntowanie podłoży, malowanie wysokojakościowe. W ramach projektu osiągnięte zostaną następujące wskaźniki: -liczba zabytków nieruchomych objętych wsparciem–1 - liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami–1 -liczba projektów, w których sfinansowano koszty racjonalnych usprawnień dla osób z niepełnosprawnościami-0 - wzrost oczekiwanej liczby odwiedzin w objętych wsparciem miejscach należących do dziedzictwa kulturalnego i naturalnego oraz stanowiących atrakcje turystyczne–wzrost o 1050 os./rok Celem projektu jest zwiększona dostępność zasobów kulturowych regionu poprzez zabezpieczenie obiektu dziedzictwa kulturowego - kościoła pw. Narodzenie NMP w Piekoszowie (konserwacja, renowacja oraz zabezpieczenie zabytku przed zagrożeniami wraz z zagospodarowaniem otoczenia) wraz z dostosowaniem go do funkcji turystycznych. Cel zgodny jest z celem szcz. wyznaczonym dla danej osi prioryt.RPO WŚ 2014-2020 oraz celem działania. Projekt realizowany będzie w okresie 1.07.2017-31.12.2017 (Polish)
    0 references
    The implementation of the project will consist of carrying out renovation works including: —repair of the towers roof link + others (including carpentry works)-according to the estimate: dismantling of cover and formwork, new formwork, membrane position, replacement of floor elements, fungation, blinds assembly, stained glass construction and installation, stucco maintenance, renovation of wooden ceilings and support bells; —exchange of towers roofing + sheet metalworking: scaffolding, dismantling of old cover, covering towers and domes with sheet metal, lightning systems, repair of sheet metalworking; —renovation of western facade plaster and towers: preparatory works, cleaning of surfaces, welds, repair of historic walls, replenishment of plasters, impregnation with mould preparation, location of refurbishment plasters (overlays on thickening, calcareous putty), construction of profiles of noble decorative drawings, priming of substrates, high quality painting. The project will achieve the following indicators: —number of real-estate monuments supported-1 – number of facilities tailored to the needs of people with disabilities-1 – number of projects which financed the costs of rational improvements for people with disabilities-0 – increase in the expected number of visits in supported sites belonging to cultural and natural heritage and which are tourist attractions-increase by 1050 persons/year The aim of the project is to increase the availability of cultural resources of the region by securing the cultural heritage object – the church. The Nativity of the Blessed Virgin Mary in Piekoszów (maintenance, renovation and protection of the monument against threats along with the development of the surroundings) along with its adaptation to tourist functions. The goal is consistent with the goal set for the priority axis WWW 2014-2020 and the purpose of the action. The project will be implemented in the period 1.07.2017-31.12.2017 (English)
    21 October 2020
    0 references

    Identifiers

    RPSW.04.04.00-26-0012/16
    0 references