Thermal modernisation of public utility facilities and use of renewable heat sources in the School Complex No. 2 in Koniecpol (Q123985)

From EU Knowledge Graph
Revision as of 17:40, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q123985 in Poland
Language Label Description Also known as
English
Thermal modernisation of public utility facilities and use of renewable heat sources in the School Complex No. 2 in Koniecpol
Project Q123985 in Poland

    Statements

    0 references
    2,258,510.35 zloty
    0 references
    542,042.48 Euro
    13 January 2020
    0 references
    2,657,071.0 zloty
    0 references
    637,697.04 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    29 December 2015
    0 references
    31 July 2019
    0 references
    GMINA KONIECPOL
    0 references

    50°46'21.0"N, 19°40'37.2"E
    0 references
    Przedmiotem projektu są działania termomodernizacyjne w budynku użyteczności publicznej Zespołu Szkół nr 2, zlokalizowanym w Koniecpolu, przy ul. Szkolnej 17 Zakres prac budowlano-instalacyjnych obejmuje: - docieplenie przegród zewnętrznych i stropodachów; - wymianę okien i drzwi zewnętrznych; - poprawę sprawności wentylacji grawitacyjnej w budynku z nadbudową kominów; - wymianę instalacji centralnego ogrzewania wraz z grzejnikami, - wymianę węzła cieplnego na kompaktowy dwufunkcyjny (obiekt zasilany jest z sieci miejskiej) z zastosowaniem 2 pomocniczych powietrznych pomp ciepła - modernizację systemu przygotowania ciepłej wody użytkowej poprzez wymianę instalacji, cyrkulacji, zastosowanie płaszczowego wymiennika ciepła do centralnego przygotowania ciepłej wody wraz z wymianą armatury na wodooszczędną. - montaż 5 szt. paneli fotowoltaicznych (Polish)
    0 references
    The subject of the project is thermal modernisation activities in the public utility building of School Complex No. 2, located in Koniecpol, at ul. School 17 The scope of construction and installation works includes: — warming of outer partitions and stropods; — replacement of windows and external doors; — improving the efficiency of gravity ventilation in a building with a superstructure of chimneys; — exchange of central heating system with radiators, – replacement of the heat node for a compact dual function (the facility is powered from the urban network) with the use of 2 auxiliary air heat pumps – modernisation of the hot water preparation system by replacing the installation, circulation, use of a coat heat exchanger for central hot water preparation and replacement of the fitting with water-saving. — installation of 5 photovoltaic panels (English)
    21 October 2020
    0 references

    Identifiers

    RPSL.04.03.02-24-04A1/17
    0 references