Installation of renewable energy sources in public buildings in the Radmno rural commune. (Q118512)

From EU Knowledge Graph
Revision as of 16:36, 29 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q118512 in Poland
Language Label Description Also known as
English
Installation of renewable energy sources in public buildings in the Radmno rural commune.
Project Q118512 in Poland

    Statements

    0 references
    1,417,965.75 zloty
    0 references
    340,311.78 Euro
    13 January 2020
    0 references
    1,668,195.0 zloty
    0 references
    400,366.8 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 May 2017
    0 references
    30 September 2019
    0 references
    GMINA RADYMNO
    0 references
    0 references
    Celem realizacji proj. jest zwiększenie ilości energii pozyskiwanej z OZE, poprawa jakości i ochrony środowiska, zwiększenie efektywności wykorzystania biomasy, energii słonecznej, energii geotermalnej, zmniejszenie emisji gazów cieplarnianych do atmosfery. Projekt dot.:a) wymiany starych olejowych dwóch kotłowni (Zespół Szkół w Duńkowicach oraz Zespół Szkół w Nienowicach) na nowe kotłownie biomasowe. Moc: 251 kW (Duńkwice), 251 kW (Nienowice). Łączna moc: 502 kWb) Instalacja PV o łącznej mocy 91,12 kWp na 10 budynkach użyt. publ. (Zespół Szkół w Duńkowicach: 20x340 Wp=6,8 kWp, Zespół Szkół w Nienowicach: 12 x 340=4,08 kWp, Zespół Szkół w Chotyńcu: 80x340=27,20 kWp; Zespół Szkół w Korczowej: 70 x 340=23,8 kWp; Remizo-Świetlica w Duńkowicach: 16x340Wp=5,44kWp; Remizo-Świetlica w Nienowicach: 20x340Wp=6,8 kWp; Remizo-Świetlica w Chotyńcu: 12 x340 Wp=4,08 kWp; Remizo-Świetlica w Korczowej: 18x340Wp=6,12 kWp; Świetlica w Grabowcu: 12 x 340 Wp=4,08 kWp; Świetlica w Piaskach: 8x340 Wp=2,72 kWp. c) Instalacja pieców akumulacyjnych dla 5 budynków użyt. publ. (Remizo-Świetlica w Duńkowicach: 6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230; R-Ś w Nienowicach:6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, R-Ś w Chotyńcu: 8xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, R-Ś w Korczowej: 8xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230, S w Piaskach: 6xDOA 20/E o mocy 2 kW i zasilaniu 3/N/PE 230d) Instalacja pomp ciepła dla 2 bud. użyt.publ (Zespół Szkół w Chotyńcu: 2 xPC AW 36,7 kW (A2W35), Zespół Szkół w Korczowej: 1PC AW 67,6 kW (A2W35)Celem proj. jest: 1. Poprawa jakości powietrza w gminie poprzez ograniczenie emisji CO2 o 155,32 Mg CO22. Zwiększenie poziomu produkcji energii z OZE (energii elektrycznej: 0,82 MWhe/rok, energii cieplnej: 492,68 MWht/rok)3. Zwiększenie ilości budynków użyteczności pub. korzystających z odnawialnych źródeł energii poprzez montaż zestawów urządzeń OZE (10 budynków użyteczności pub.)Obiekty na których będą montowane OZE pokryte są blachą. (Polish)
    0 references
    The aim of the project is to increase the amount of energy generated from RES, to improve the quality and protection of the environment, to increase the efficiency of the use of biomass, solar energy, geothermal energy, and to reduce greenhouse gas emissions into the atmosphere. Project:a) replacement of the old oil boiler rooms (School Team in Duńkowice and the School Complex in Nienowice) for new biomass boiler rooms. Power: 251 kW (Duńkwice), 251 kW (Nienowice). Total power: 502 KWB) PV installation with a total capacity of 91.12 kWp per 10 buildings. publ. (School team in Duńkowice: 20x340 Wp=6.8 kWp, School Complex in Nienowice: 12 x 340=4.08 kWp, Chotyniec School Complex: 80x340=27,20 kWp; Korczowa School Complex: 70 x 340=23,8 kWp; Remizo-Świetlica in Duńkowice: 16x340Wp=5,44kWp; Remizo Lights in Nienowice: 20x340Wp=6,8 kWp; Lighthouse in Chotyniec: 12 x340 Wp=4,08 kWp; Lighthouse in Korczowa: 18x340Wp=6,12 kWp; Common room in Grabowiec: 12 x 340 Wp=4,08 kWp; Common room in Sands: 8x340 Wp=2.72 kWp. c) Installation of accumulation furnaces for 5 buildings use publ. (Remizo-Świetlica in Duńkowice: 6xDOA 20/E with a power of 2 kW and 3/N/PE 230; R-Ś in Nienowice:6xDOA 20/E with 2 kW power and 3/N/PE 230, R-Ś in Chotyniec: 8xDOA 20/E with 2 kW power and 3/N/PE 230, R-Ś in Korczowa: 8xDOA 20/E with 2 kW power and 3/N/PE 230, S in Sands: 6xDOA 20/E with 2 kW power and 3/N/PE 230d power supply) Installation of heat pumps for 2 constructions. publ (School Team in Chotyniec: 2 xPC AW 36,7 kW (A2W35), School Complex in Korczowa: 1PC AW 67,6 kW (A2W35)The aim of the project is: 1. Improve air quality in the municipality by reducing CO2 emissions by 155.32 Mg CO22. Increase the level of energy production from RES (electricity: 0,82 MWhe/year, thermal energy: 492,68 MWht/year)3. Increase the number of buildings of utility pub. using renewable energy sources by assembling sets of RES devices (10 buildings of utility pub.)Objects on which RES will be assembled are covered with sheet metal. (English)
    20 October 2020
    0 references

    Identifiers

    RPPK.03.01.00-18-0096/17
    0 references