“Construction of infrastructure for walking — cycling in the Opole county — stage II and construction of a hub in the municipality of Lewin Brzeski” (Q114854)

From EU Knowledge Graph
Revision as of 15:22, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The aim of the project is to improve the quality of life of the local community by reducing air pollution in the Opole Agglomeration, as a result of the development of infrastructure for cycling, and through the construction of interchange centres and car parks Bike&Ride;Ride combining individual means of transport with public public transport such as railways and buses. As part of the implementation of the project, the following will be created...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of infrastructure for walking — cycling in the Opole county — stage II and construction of a hub in the municipality of Lewin Brzeski”
Project in Poland financed by DG Regio

    Statements

    0 references
    39,791,064.92 zloty
    0 references
    9,549,855.58 Euro
    13 January 2020
    0 references
    49,037,887.95 zloty
    0 references
    11,769,093.11 Euro
    13 January 2020
    0 references
    81.14 percent
    0 references
    21 December 2016
    0 references
    31 December 2021
    0 references
    POWIAT OPOLSKI
    0 references
    Przedmiotem projektu jest poprawa jakości życia społeczności lokalnej poprzez ograniczenie zanieczyszczenia powietrza na obszarze Aglomeracji Opolskiej, wskutek rozbudowy infrastruktury dla ruchu rowerowego, a poprzez budowę centrów przesiadkowych oraz parkingów Bike&Ride i Park&Ride łączenie indywidualnych środków transportu z publicznym transportem zbiorowym jakimi są kolej i autobusy. W ramach realizacji projektu powstanie: infrastruktura pieszo-rowerowa o łącznej dług. 38,52 km (w tym wybudowanej 33,19km, przebudowanej 2,80km i wyznaczonej 2,53km); 6 park. Bike&Ride zlokalizowanych w pobliżu stacji kolej. (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice i Turawa) oraz przystanku autobus. (Prószków-Pomologia). Łącznie powstanie 160 stanowisk dla rowerów w ramach park. Bike&Ride; 4 parkingi Park&Ride zlokalizowanych w pobliżu stacji kolej (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), na łączną liczbę 66 miejsc postojowych dla samochodów w tym 5 miejsc dla osób niepełnosprawnych; centrum przesiadkowe w m. Lewin Brzeski przy dworcu kolejowym obsługującym główną linię relacji Opole – Wrocław; centrum przesiadkowe w m. Tułowice przy stacji kolej. obsługującej linię relacji Opole – Nysa; centrum przesiadkowe w m. Suchy Bór przy stacji kolej. obsługującej linię relacji Opole –Fosowskie. Projekt przewiduje również budowę energooszczędnego oświetlenia typu LED oraz wymianę istniejących lamp na energooszczędne wzdłuż planowanej do budowy infrastruktury pieszo-rowerowej oraz uzupełnienie energooszczędnego oświetlenia ulicznego na terenie miasta Lewin Brzeski (ul.: Rolna, Pocztowa, Krasickiego, Marzanny, Wiśniowa, Leśna, Wiosenna, Rzemieślnicza, Szafirowa, Kościuszki, Ochronna, Kościuszki, Mickiewicza, Zamkowa, Cicha, Jesienna, Słowackiego, Akacjowa, Kolejowa). W ramach projektu wykonane zostaną niezbędne roboty związane z poszerzeniem jezdni dróg powiat. (1702O, 1703O, 1705O, 1712O, 1756O) i wojewódzkich (414, 461), na odc. wzdłuż których powstaną drogi dla rowerów (Polish)
    0 references
    The aim of the project is to improve the quality of life of the local community by reducing air pollution in the Opole Agglomeration, as a result of the development of infrastructure for cycling, and through the construction of interchange centres and car parks Bike&Ride;Ride combining individual means of transport with public public transport such as railways and buses. As part of the implementation of the project, the following will be created: infrastructure on foot-bicycle with a total debt. 38,52 km (including 33,19 km built, reconstructed 2,80 km and designated 2,53 km); It’s 6 park. Bike &Ride located near the railway station. (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice and Turawa) and bus stop. (Customs-pomology). A total of 160 bicycle stations will be built within the park. Bike&Ride; 4 parking lots of Park &Ride located near the station (Suchy Bór, Tarnów Op., Lewin Brzeski, Tułowice), for a total of 66 parking spaces for cars including 5 seats for disabled people; interchange centre in Lewin Brzeski at the railway station serving the main line of the Opole-Wroc³aw relationship; interchange centre in Tułowice near the railway station. serving the Opole – Nysa line; interchange centre in Suchy Bór near the railway station. serving the Opole-Fosowskie line. The project also provides for the construction of energy-saving LED lighting and replacement of existing lamps for energy-efficient along the planned construction of foot-bike infrastructure and supplementing energy-saving street lighting in the city of Lewin Brzeski (ul.: Agricultural, Pocztowa, Krasicki, Marzanny, Wiśniowa, Leśna, Spring, Rzemieślnicza, Szafirova, Kościuszki, Ochronna, Kościuszki, Mickiewicza, Zamkowa, Cicha, Autumn, Słowacki, Akaciwa, Kolejowa). As part of the project, the necessary works related to the extension of the roadways of the district will be carried out. (1702O, 1703O, 1705O, 1712O, 1756O) and voivodships (414, 461) along which roads for bicycles will be created (English)
    20 October 2020
    0 references

    Identifiers

    RPOP.03.01.02-16-0005/16
    0 references