Energy renovation of municipal public buildings (Q112267)

From EU Knowledge Graph
Revision as of 11:23, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project provides for 3 tasks: Project preparation, Energy modernisation of public buildings and Promotion. The material scope of the project, in particular, as far as no. 2 results from the developed energet audits. The Jasienna SP shall include: modern. central heating system, exit door, modernisation of central heating system, replacement of windows, warming of ceilings in the attic, warming of external walls, repair of external stairs and...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of municipal public buildings
Project in Poland financed by DG Regio

    Statements

    0 references
    949,074.98 zloty
    0 references
    227,778.00 Euro
    13 January 2020
    0 references
    1,581,791.64 zloty
    0 references
    379,629.99 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    30 December 2015
    0 references
    31 March 2019
    0 references
    GMINA KORZENNA
    0 references
    W projekcie przewidziano wykonanie 3 zadań: Przygotowanie projektu, Modernizacja energetyczna budynków użyteczności publicznej oraz Promocja. Zakres rzeczowy projektu, w szczegól. zad. nr 2 wynika z opracowanych audytów energet. W SP Jasienna obejmuje: modern. instalacji c.o., wyminę drzwi zewn., modernizację instalacji c.w.u., wymianę okien, ocieplenie stropu na poddaszu, ociepl. ścian zewnętrznych, wyk. inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W SP Miłkowa: modernizację instalacji c.o., wyminę drzwi zewn., montaż nawiewników, ocieplenie stropu na poddaszu, modernizację instalacji c.w.u., ocieplenie ścian zewnętrznych, wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spustowych. W OW Bukowiec: modernizację instalacji c.o., wyminę okien i drzwi zewn., montaż nawiewników, modern. instalacji c.w.u., ocieplenie stropu na poddaszu wraz z jego wyminą, ocieplenie ścian zewn., w tym fundament., wyk inst. odgr., remont schodów zewn. i kominów, montaż nowych rynien i rur spust. W wyniku realizacji projektu wystąpi: 1.Poprawa efektywności energetycznej o 64%. 2.Zastosowanie indywidualnych liczników ciepła i c.w.u. 3.Montaż termostatów i zaworów podpionowych (wg audytu energetycznego). fXLISD0XlSclcQUFJtjrlPV5KRB56u2B0U4zOn5J 11 4.Redukcja emisji CO2 o 77%. 5.Obniżenie emisji pyłów (PM 10 i PM 2,5) o 94%. Wskaźniki produktu: Liczba zmodernizowanych energetycznie budynków-3szt. Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE – 3 szt. Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych - 0,006 MWt Wskaźniki rezultatu: Zmniejszenie zużycia energii końcowej w wyniku realizacji projektów – 2 188 GJ/rok Zmniejszenie rocznego zużycia energii pierwotnej w budynkach publicznych – 728 476 kWh/rok Ilość zaoszczędzonej energii cieplnej - 2 192 GJ/rok Szacowany roczny spadek gazów cieplarnianych – 179,9 t CO2/rok Produkcja energii cieplnej z nowo wybudowanych instalacj (Polish)
    0 references
    The project provides for 3 tasks: Project preparation, Energy modernisation of public buildings and Promotion. The material scope of the project, in particular, as far as no. 2 results from the developed energet audits. The Jasienna SP shall include: modern. central heating system, exit door, modernisation of central heating system, replacement of windows, warming of ceilings in the attic, warming of external walls, repair of external stairs and chimneys, installation of new gutters and pipes. In SP Miłków: modernisation of the central heating system, exit door, installation of vents, warming of ceilings in the attic, modernisation of central heating installations, warming of external walls, extremity, renovation of external stairs and chimneys, installation of new gutters and drain pipes. In OW Bukowiec: modernisation of the central heating system, extinguishing windows and external doors, installation of vents, modern central heating system, warming of the ceiling in the attic along with its evisceration, warming of the outer walls, including foundation, forged stairs and chimneys, installation of new gutters and pipes. As a result of the project, there will be: 1.Improving energy efficiency by 64 %. 2.Application of individual heat meters and hot temperature 3.Assembly of thermostats and sub-pipe valves (according to energy audit). fXLISD0XlSclcQUFJtjrlPV5KRB56u2B0U4zOn5J 11 4. 5.Decrease in dust emissions (PM 10 and PM 2.5) by 94 %. Output indicators: Number of energy-renovated buildings – 3 pieces. Number of built units of heat generation from RES – 3 pcs. Additional capacity to generate heat from renewable sources – 0,006 MWt Results indicators: Reduction of final energy consumption as a result of projects – 2 188 GJ/year Reduction of annual primary energy consumption in public buildings – 728476 kWh/year Number of thermal energy saved – 2 192 GJ/year Estimated annual decrease in greenhouse gases – 179,9 t CO2/year Production of heat from newly built installations (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.02-12-0269/16
    0 references