Thermal modernisation of sports facilities in Krakow (Q112200)

From EU Knowledge Graph
Revision as of 11:22, 20 October 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The subject of the project is to increase the energy efficiency of the KS Korona sports facility in Krakow. This facility is located in a quarter closed by Kalwaryjska, Warneńczyka, Zamojski and Independence Place. Within the KS Crown object four functional parts have been separated: administrative building, connecting building, pool building and sports hall. Administrative building with entrance from the street. Kalwaryjska is connected to the...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Thermal modernisation of sports facilities in Krakow
Project in Poland financed by DG Regio

    Statements

    0 references
    1,035,024.9 zloty
    0 references
    248,405.98 Euro
    13 January 2020
    0 references
    1,725,041.52 zloty
    0 references
    414,009.96 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    6 June 2016
    0 references
    30 March 2018
    0 references
    GMINA MIEJSKA KRAKÓW
    0 references
    0 references
    Przedmiotem projektu jest podniesienie efektywności energetycznej obiektu sportowego KS Korona w Krakowie. Obiekt ten położony jest w kwartale zamkniętym ulicami Kalwaryjską, Warneńczyka, Zamojskiego i Placem Niepodległości. W ramach obiektu KS Korony wydzielone zostały cztery funkcjonalne części: budynek administracyjny, łącznik (przewiązka), budynek basenu i hala sportowa. Budynek administracyjny z wejściem od strony ul. Kalwaryjskiej jest połączony z budynkiem basenu łącznikiem (przewiązką) i parterową zabudową. Wszystkie budynki połączone są ze sobą zespołem piwnic w części użytkowych. W ramach projektu wyznaczono do termomodernizacji trzy z czterech części kompleksu tj.: I etap projektu - budynek administracyjny wraz z łącznikiem (przewiązką) oraz II etap projektu - budynek basenu. Kompleks sportowy KS Korona powstał na przełomie lat 50 oraz 60 i choć był poddawany pewnym modyfikacjom i usprawnieniom, to główne elementy budynków zostały niezmienione. Dlatego tak istotne jest wykonanie kompleksowych prac termomodernizacyjnych, które umożliwią wprowadzenie współczesnych standardów energetycznych oraz znacząco poprawią komfort i efektywność użytkowania tych obiektów. Zespół budynków Korony jest wpisany do Ewidencji Zabytków Miasta Krakowa. Budynki znajdują się w układzie urbanistycznym Podgórza wpisanego do rejestru zabytków pod numerem A-608 z dnia 26.10.1981 na obszarze Pomnika Historii (Zarządzenia Prezydenta RP z 8.09.1994 r.). W ramach projektu wydzielono 3 zadania: 1. Przygotowanie projektu; 2. Realizacja projektu; 3. Zarządzanie projektem. Dzięki realizacji projektu zostanie poprawiona efektywność energetyczna części budynków użyteczności publicznej, a co za tym idzie zmniejszy się zapotrzebowanie na energię końcową o 42,8% oraz emisja gazów cieplarnianych o 183 ton CO2/rok. W konsekwencji przyczyni się to do poprawy stanu środowiska naturalnego oraz podniesienia jakości życia na terenie Krakowskiego Obszaru Funkcjonalnego. Dalszy opis w punkcie Q. (Polish)
    0 references
    The subject of the project is to increase the energy efficiency of the KS Korona sports facility in Krakow. This facility is located in a quarter closed by Kalwaryjska, Warneńczyka, Zamojski and Independence Place. Within the KS Crown object four functional parts have been separated: administrative building, connecting building, pool building and sports hall. Administrative building with entrance from the street. Kalwaryjska is connected to the building of the swimming pool by a connecting link and a ground-floor building. All buildings are connected together by a set of cellars in utility parts. As part of the project, three out of four parts of the complex were designated for thermal modernisation, i.e.: The first stage of the project – the administrative building with the connecting link and the second stage of the project – the swimming pool building. The KS Korona sports complex was built in the late 50s and 60s, and although it was subjected to some modifications and improvements, the main elements of the buildings were unchanged. Therefore, it is so important to carry out comprehensive thermomodernisation works, which will allow the introduction of modern energy standards and significantly improve the comfort and efficiency of the use of these facilities. The complex of buildings of the Crown is inscribed in the Register of Monuments of the City of Krakow. The buildings are located in the urban layout of Podgórza entered in the register of monuments under number A-608 dated 26.10.1981 in the area of the Monument of History (Ordinances of the President of the Republic of Poland from 8.09.1994). Within the framework of the project, 3 tasks were assigned: 1. Preparation of the project; 2. Implementation of the project; 3. It’s project management. The implementation of the project will improve the energy efficiency of parts of public buildings, thereby reducing final energy demand by 42.8 % and greenhouse gas emissions by 183 tonnes of CO2/year. As a result, this will contribute to improving the environment and improving the quality of life in the Kraków Functional Area. Further description in point Q. (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.03.01-12-0218/16
    0 references