Programme to increase the use of energy and improve the quality of air within NATURA 2000 areas, Suski District – solars, photovoltaics, POMPY CIEPŁA_2 (Q112095)

From EU Knowledge Graph
Revision as of 10:54, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Programme to increase the use of energy and improve the quality of air within NATURA 2000 areas, Suski District – solars, photovoltaics, POMPY CIEPŁA_2
Project in Poland financed by DG Regio

    Statements

    0 references
    15,259,568.06 zloty
    0 references
    3,662,296.33 Euro
    13 January 2020
    0 references
    25,432,613.47 zloty
    0 references
    6,103,827.23 Euro
    13 January 2020
    0 references
    60.0 percent
    0 references
    1 September 2016
    0 references
    30 June 2021
    0 references
    POWIAT SUSKI
    0 references
    0 references
    Przedmiotem projektu będzie zakup i montaż : 546 instalacji fotowoltaicznych, 1365 instalacji solarnych i 89 pomp ciepła powietrznych w obrębie budownictwa jednorodzinnego rozproszonego wraz z pracami niezbędnymi do funkcjonowania wymienionych urządzeń. Każda zaprojektowana i wykonana instalacja solarna powinna zabezpieczyć pokrycie na energię potrzebną do ogrzania wody użytkowej dla każdego gospodarstwa domowego na poziomie minimum 55 w skali całego roku. llość montowanych kolektorów słonecznych i pojemność zbiornika na ciepłą wodę powinna zapewniać przynajmniej 50 litrów ciepłej wody na osobędobę o temperaturze od 50 do 60C . Moduły fotowoltaiczne muszą posiadać zaświadczenia podmiotu uprawnionego do kontroli jakości potwierdzającego, że ofertowane moduły przeszły badania wg procedur IEC potwierdzające ich pełną zgodność z zakresem normy PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 i PNEN 61829. Wszystkie urządzenia powinny posiadać aktualne badania i dopuszczenia do stosowania w naszym kraju. Mocowanie ogniw musi być wykonane z materiału nie korodującego i nie naruszającego struktury ogniwa i musi być dopuszczone do stosowania przez producenta paneli. Zestaw fotowoltaiczny musi zapewniać prawidłowe współdziałanie z istniejącymi instalacjami elektrycznymi.. Wykonawca zapewnić musi taki montaż instalacji PV aby nie dochodziło do jakiegokolwiek zaciemnienia paneli w przeciwnym razie zastosuje optymalizery. Minimalne parametry przyjętych pomp ciepła: moc grzewcza pompy ciepła min. 2,0 kW, moc grzałki elektrycznej min. 2,0 kW, klasa sezonowej efektywności energetycznej ErP min. A efektywność COP wg PNEN 2553 min. 3,2 A15W1545Instalacje solarne, fotowoltaiczne,pompy ciepła będą montowane na terenie gmin:Budzów, Bystra Sidzina, Jordanów gmina wiejska, Jordanów gmina miejska, Zawoja, Maków Podhalański gmina miejsko wiejska , Stryszawa, Zembrzyce , Sucha Beskidzka gmina miejska. (Polish)
    0 references
    The subject of the project will be the purchase and assembly of: 546 photovoltaic installations, 1365 solar installations and 89 air heat pumps within a single-family dispersed building, together with the work necessary for the operation of the said equipment. Each solar system designed and constructed shall secure the energy required to heat the water for each household at a minimum of 55 per year. The number of solar collectors to be installed and the capacity of the hot water tank shall provide at least 50 litres of hot water per person per day with a temperature of 50 to 60 °C. Photovoltaic modules must have attested to the quality control authority confirming that the modules offered have undergone tests according to IEC procedures confirming their full compliance with the scope of PNEN 61215, PNEN 61646, PNEN 60891, PNEN 60904, PNEN 617302 and PNEN 61829 standards. All devices should have up-to-date tests and approvals for use in our country. The mounting of the cells must be made of non-corroding and non-corrosive material and must be authorised for use by the panel manufacturer. The photovoltaic set shall ensure proper interaction with existing electrical installations. The contractor must ensure that the PV installation is installed so that there is no blackout of the panels otherwise the optimisers are applied. Minimum parameters of intake heat pumps: heating power of heat pumps min. 2.0 kW, power of electric heater min. 2.0 kW, seasonal energy efficiency class ErP min. A COP efficiency according to PNEN 2553 min. 3.2 A15W1545Solar installations, photovoltaic heat pumps will be installed in the communes of:Budzów, Bystra Sidzina, Jordanów Municipality, Jordanów Municipality, Zawoja, Maków Podhalański Urban Municipality Srodzka, Stryszawa, Zerzyszawa (English)
    20 October 2020
    0 references

    Identifiers

    RPMP.04.01.01-12-1094/17
    0 references