Revitalisation of the White Mountain in Justynówka and Majdan Górny_2 (Q107565)

From EU Knowledge Graph
Revision as of 10:12, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Revitalisation of the White Mountain in Justynówka and Majdan Górny_2
Project in Poland financed by DG Regio

    Statements

    0 references
    3,670,862.93 zloty
    0 references
    881,007.10 Euro
    13 January 2020
    0 references
    5,398,327.84 zloty
    0 references
    1,295,598.68 Euro
    13 January 2020
    0 references
    68.0 percent
    0 references
    29 September 2017
    0 references
    30 December 2021
    0 references
    GMINA TOMASZÓW LUBELSKI
    0 references
    0 references

    50°26'5.6"N, 23°26'59.6"E
    0 references
    Projekt ma na celu wyprowadzenie obszaru zdegradowanego na terenie Gminy Tomaszów Lubelski z sytuacji kryzysowej oraz wzmocnienie potencjałów rozwojowych tego obszaru poprzez rewitalizację Białej Góry w Justynówce i Majdanie Górnym. Projekt ukierunkowany jest w szczególności na poprawę jakości korzystania z przestrzeni, likwidację izolacji obszarów problemowych oraz poprawę jakości życia mieszkańców obszarów zdegradowanych na terenie Gminy Tomaszów Lubelski. Zakres przedsięwzięcia obejmuje: remont istniejących obiektów, tj.: wyciągu orczykowego, instalacji naśnieżania stoku, zbiornika wody dla potrzeb naśnieżania, stacji transformatorowej, ujęcia wody, uzbrojenia na działkach, oraz budowę budynku administracyjno-usługowego wraz z infrastrukturą towarzyszącą. Zakupione zostanie także wyposażenie. Grupę docelową projektu, która odniesie bezpośrednie korzyści z realizacji projektu na poziomie jego realizacji stanowią mieszkańcy obszaru zdegradowanego, którzy będą aktywnie spędzać wolny czas. Realizacja projektu umożliwi mieszkańcom (seniorzy, dzieci, młodzież, osoby bezrobotne) aktywizację i integrację ze społeczeństwem. Realizacja projektu wpłynie na powstanie nowych miejsc pracy (zatrudniony personel) oraz przyczyni się do poprawy jakości powietrza. Zredukowana zostanie emisja zanieczyszczeń do powietrza poprzez montaż instalacji urządzeń wykorzystujących odnawialne źródła energii (kolektory słoneczne) oraz zastosowanie oświetlenia LED. Realizacja projektu pozwoli na osiągnięcie wskaźników rezultatu zapisanych w Szczegółowym Opisie Osi priorytetowych adekwatnych do konkursu 13.4: a) Liczba osób korzystających z obiektów infrastruktury społecznej/kulturalnej/ turystycznej będącej przedmiotem projektu - 2000 osób, b) Liczba obiektów infrastruktury zlokalizowanych na rewitalizowanych obszarach - 1 szt. d) Powierzchnia obszarów objętych rewitalizacją 2,9672 ha, e) Powierzchnia terenów przygotowanych pod działalność gospodarczą - 5,46 m2. (Polish)
    0 references
    The project aims to remove the degraded area in the Tomaszów Lubelski commune from the crisis situation and to strengthen the development potential of the area through revitalisation of Biała Góra in Justynówka and Majdan Górny. The project is aimed in particular at improving the quality of the use of space, eliminating the isolation of problem areas and improving the quality of life of residents of areas degraded in Tomaszów Lubelski commune. The scope of the project shall include: renovation of existing facilities, i.e.: T-bar lift, snow installation, snow tank for snowing purposes, transformer station, water intake, armament on plots, and construction of administrative and service building together with accompanying infrastructure. Equipment will also be purchased. The project target group, which will benefit directly from the implementation of the project at the level of its implementation, are residents of the degraded area, who will actively spend their free time. Implementation of the project will enable residents (senior, children, young people, unemployed) to activate and integrate into society. The implementation of the project will contribute to the creation of new jobs (employed staff) and will contribute to improving air quality. Emissions of pollutants into the air will be reduced by installing equipment using renewable energy sources (solar collectors) and using LED lighting. The implementation of the project will allow the achievement of the result indicators recorded in the Detailed Description of the priority axis relevant to the competition 13.4: a) Number of people using social/cultural/tourism infrastructure facilities covered by the project – 2000 persons, b) Number of infrastructure facilities located in revitalised areas – 1 pieces d) Areas covered by the revitalisation 2,9672 ha, e) Areas prepared for economic activity – 5,46 m². (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.13.04.00-06-0075/17
    0 references