Improvement of energy efficiency of Józef Piłsudski Academy of Physical Education in Warsaw Philia w Biała Podlaska_2 (Q105410)

From EU Knowledge Graph
Revision as of 09:00, 20 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Improvement of energy efficiency of Józef Piłsudski Academy of Physical Education in Warsaw Philia w Biała Podlaska_2
Project in Poland financed by DG Regio

    Statements

    0 references
    1,150,104.05 zloty
    0 references
    276,024.97 Euro
    13 January 2020
    0 references
    1,353,063.63 zloty
    0 references
    324,735.27 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    5 September 2016
    0 references
    30 June 2020
    0 references
    AKADEMIA WYCHOWANIA FIZYCZNEGO JÓZEFA PIŁSUDSKIEGO W WARSZAWIE
    0 references
    Istotą projektu jest poprawa efektywności energetycznej obiektów AWF poprzez: -remont instalacji c.o.(wymiana rurociągów z izolacją, montaż zaworów regulacyjnych, uzupełnienie zaworów grzejnikowych); -montaż systemów pomiaru i zarządzania wykorzystaniem energii; - docieplenie ścian, w tym fundamentowych oraz stropodachu; - wymianę okien i drzwi przeszklonych oraz montaż instalacji solarnej, które rozwiążą kluczowe problemy związane z: niedostatecznym poziomem termoizolacji, brakiem zarządzania energią i brakiem dywersyfikacji źródeł energii. Kluczowe grupy docelowe to: studenci, kandydaci na studia, absolwenci, pracownicy AWF, organizacje proekologiczne, działacze na rzecz środowiska naturalnego, mieszkańcy Lubelszczyzny, odwiedzający Filię, opinia publiczna. Osiągnięte wskaźniki --Ilość zaoszczędzonej energii cieplnej: 2054GJ/rok; -Zmniejszenie rocznego zużycia energii pierwotnej w budynkach Publicznych: 570555,56 kWh/rok; -Szacunkowy roczny spadek emisji gazów cieplarnianych: 112,26 tCO2/rok; -Produkcja energii cieplnej z nowowybudowanych instalacji wwykorzystujących OZE: 11,11MWht/rok; -Dodatkowa zdolność wytwarzania energii ze źródeł odnawialnych: 0,10866; --Dodatkowa zdolność wytwarzania energii cieplnej ze źródeł odnawialnych: 0,10866; -Produkcja energii cieplnej z nowowybudowanych mocy wytwórczych instalacji OZE: 11,11 MWht/rok; -Liczba obiektów dostosowanych do potrzeb osób z niepełnosprawnościami: 2; -Liczba zmodernizowanych energetycznie budynków: 2 szt; -Liczba wybudowanych jednostek wytwarzania energii cieplnej z OZE: 1 szt; -Powierzchnia użytkowa budynków poddanych termomodernizacji: 2235,6 m2; (Polish)
    0 references
    The essence of the project is to improve the energy efficiency of AWF facilities by: —repair of the central heating system (replacement of insulated pipelines, installation of control valves, replenishment of radiator valves); —assembly of energy metering and management systems; — warming of walls, including foundation walls and ceilings; — replacement of windows and glazed doors and installation of solar installations, which will solve key problems related to: insufficient levels of thermal insulation, lack of energy management and lack of diversification of energy sources. Key target groups are: students, candidates for studies, graduates, employees of AWF, environmental organisations, environmental activists, residents of Lublin region, visitors to the Philly, public opinion. Achieved indices --Quantity of thermal energy saved: 2054GJ/year; —Reducing annual primary energy consumption in public buildings: 570555,56 kWh/year; —An estimated annual reduction in greenhouse gas emissions: 112,26 tCO2/year; —Production of thermal energy from newly built RES installations: 11,11MWht/year; —Additional capacity to generate energy from renewable sources: 0,10866; —Additional capacity to generate heat from renewable sources: 0,10866; —Production of thermal energy from newly built RES plants: 11,11 MWht/year; —Number of facilities tailored to the needs of people with disabilities: 2. —Number of energy upgraded buildings: 2 pcs; —Number of built units of heat generation from RES: 1 pcs; —Use surface of thermally modernised buildings: 2235,6 m²; (English)
    20 October 2020
    0 references

    Identifiers

    RPLU.05.02.00-06-0086/17
    0 references