Improving the energy efficiency of public buildings in Krasnystaw_2 (Q105338)
Jump to navigation
Jump to search
Project Q105338 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the energy efficiency of public buildings in Krasnystaw_2 |
Project Q105338 in Poland |
Statements
4,277,768.94 zloty
0 references
5,032,669.38 zloty
0 references
85.0 percent
0 references
27 October 2016
0 references
18 December 2020
0 references
GMINA KRASNYSTAW
0 references
Przedmiot projektu: głęboka termomodernizacja gminnych budynków użyteczności publicznej (5 placówek oświatowych i wiejski dom kultury) wraz z zastosowaniem OZE. Dla budynków opracowano audyty energetyczne, gdzie wskazano zakres prac termomodernizacyjnych zwiększających efektywność energetyczną oraz wskazano na konieczność instalacji OZE (fotowoltaika we wszystkich budynkach i pompa ciepła w budynku Wiejskiego Domu Kultury), które również przyczynią się do zmniejszenia zużycia energii. Zakres projektu: 1. ZESPÓŁ SZKÓŁ NR 1 W SIENNICY NADOLNEJ: ocieplenie ścian zew, wymiana okien i drzwi; modernizacja c.o. i c.w.u (w tym wymiana kotła); wymiana oświetlenia na LED; instalacja PV o mocy 36,8 kW 2. ZESPÓŁ NR 3 W KRASNYMSTAWIE: ocieplenie ścian zew, stropodachu, wymiana okien i drzwi; modernizacja c.o. i c.w.u (w tym wymiana kotła); instalacja PV o mocy 9,2 kW. 3. ZESPÓŁ NR 5 W KRUPEM: ocieplenie ścian zew, stropodachu, wymiana drzwi; modernizacja c.o. (w tym wymiana kotła); wymiana oświetlenia na LED; instalacja PV o mocy 11,5 kW. 4. SZKOŁA PODSTAWOWA W JAŚLIKOWIE: ocieplenie ścian zew, stropodachu, wymiana okien i drzwi; modernizacja c.o. (w tym wymiana kotła); instalacja PV o mocy 9,2 kW. 5. PUNKT PRZEDSZKOLNY STĘŻYCA KOLONIA: ocieplenie ścian zew, stropu, wymiana okien i drzwi; modernizacja c.o. (w tym wymiana kotła); instalacja PV o mocy 2,3 kW. 6. WIEJSKI DOM KULTURY W KRYNICY: wymiana drzwi; modernizacja c.o. i c.w.u. (wymiana instalacji; dwie powietrzne pompy ciepła o mocy grzewczej 15,17 kW i 13,50 kW); instalacja PV o mocy 2,3 kW. W wyniku realizacji projektu, efektywność energetyczna obiektów zwiększy się o 69% (na podst. danych z audytów energetycznych- średnia dla całego projektu). Spadnie zużycie energii pierwotnej- łącznie (dla całego projektu) o 579 521,86 kWh/rok. Spadnie zużycie energii końcowej - łącznie o 445 109,67 kWh/rok. Pozyskana moc z OZE wyniesie 0,07 MW. (Polish)
0 references
Subject matter of the project: deep thermal modernisation of municipal public buildings (5 educational establishments and a rural cultural centre) along with the use of RES. Energy audits were developed for buildings, where the scope of thermal modernisation works to increase energy efficiency was identified and the need to install RES (photvoltaics in all buildings and heat pump in the Rural Culture House building) were identified, which will also contribute to reducing energy consumption. Scope of the project: 1. SCHOOL TEAM NO. 1 IN SIENNICA: warming of the walls of the call, replacement of windows and doors; modernisation of central heating and hot water (including boiler replacement); switching illumination to LED; PV installation with a power of 36,8 kW 2. TEAM NO. 3 IN KRASNYSTAW: warming of the walls of the call, ceiling, window and door replacement; modernisation of central heating and hot water (including boiler replacement); PV installation with a power of 9,2 kW. 3. TEAM NUMBER 5 IN KRUPEM: warming of the walls of the call, ceiling, replacement of doors; modernisation of central heating (including boiler replacement); switching illumination to LED; PV installation with a power of 11,5 kW. 4. PRIMARY SCHOOL IN JASLIKVIA: warming of the walls of the call, ceiling, window and door replacement; modernisation of central heating (including boiler replacement); PV installation with a power of 9,2 kW. 5. PRESCHOOL POINT COLOGNE CONCENTRATION: warming of the walls of the call, ceiling, replacement of windows and doors; modernisation of central heating (including boiler replacement); PV installation with a power of 2,3 kW. 6. RURAL CULTURE HOUSE IN KRYNICA: replacement of doors; modernisation of central heating and hot water (replacement of installations; two air heat pumps with a heating power of 15,17 kW and 13,50 kW; PV installation with a power of 2,3 kW. As a result of the project, the energy efficiency of the facilities will increase by 69 % (on the basis of energy audit data – average for the whole project). Primary energy consumption will decrease – total (for the whole project) by 579521.86 kWh/year. The final energy consumption will decrease by 445109,67 kWh/year in total. The power generated from RES will be 0.07 MW. (English)
20 October 2020
0 references
Identifiers
RPLU.05.02.00-06-0052/16
0 references