CONSTRUCTION OF THE TECHNICAL INFRASTRUCTURE FACILITY IN THE FORM OF A FREE-STANDING PHOTOVOLTAIC INSTALLATION WITH A TOTAL CONNECTION CAPACITY OF UP TO 750 KW FOR PPHU ELWAT SP. J. J WŁODARCZYK, S. PASZKIEWICZ (Q101823)
Jump to navigation
Jump to search
Project in Poland financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | CONSTRUCTION OF THE TECHNICAL INFRASTRUCTURE FACILITY IN THE FORM OF A FREE-STANDING PHOTOVOLTAIC INSTALLATION WITH A TOTAL CONNECTION CAPACITY OF UP TO 750 KW FOR PPHU ELWAT SP. J. J WŁODARCZYK, S. PASZKIEWICZ |
Project in Poland financed by DG Regio |
Statements
2,316,835.14 zloty
0 references
3,130,858.3 zloty
0 references
74.0 percent
0 references
1 March 2020
0 references
30 June 2021
0 references
PPHU „ELWAT” SPÓŁKA JAWNA J. WŁODARCZYK, S. PASZKIEWICZ
0 references
Zakres obejmuje budowę instalacji oze (fotowoltaiczna szt. 1) z okablowaniem, monitoringiem i innymi elementami infrastruktury towarzyszącej oraz promocję projektu. Moce zainstalowane w projekcie (748,80 kW), ilość energii rocznie (761,00 MWh/rok). Wartość netto zakresu rzeczowego – 3801500,00 zł (4675845,00 zł brutto), w tym wyd. kwalifikowane – 3130858,30 zł, dotacja 2316835,14 zł. Cele projektu są zbieżne z celami strategicznymi rozwoju woj. oraz celami gospodarki niskoemisyjnej, w tym przede wszystkim zwiększona produkcja energii ze źródeł odnawialnych i ograniczenie emisji CO2 i innych gazów, podwyższenie poziomu ochrony środowiska. Instalacja będzie podłączona do istniejącej sieci operatora. Podmiot zarządzający infrastrukturą (wnioskodawca) na mocy umowy z operatorem będzie w części odprowadzał energię z instalacji do sieci. Celem działań w projekcie jest budowa instalacji i uruchomienie produkcji energii ze źródeł odnawialnych i ograniczenie emisji CO2, wzrost wykorzystania OZE w produkcji energii, przejście na gospodarkę niskoemisyjną i zmniejszenie udziału energetyki konwencjonalnej. Cele projektu odzwierciedlają zdefiniowane potrzeby interesariuszy i zostały określone mierzalnymi wskaźnikami zgodnie z celami RPO WŁ 2014-2020 (wskaźniki produktu i rezultatu). Realizacja projektu obejmuje fazę budowy oraz eksploatacji (w okresie trwałości 3 lat od daty płatności końcowej). Projekt zapewnia ograniczenie emisji jako emisja uniknięta (nowa instalacja) służąc realizacji celów strategicznych poprzez produkcję energii ze źródeł odnawialnych (zgodność z SZOOP). W projekcie zachowano zasady koncepcji projektowania uniwersalnego (dbałość aby efekty projektu w jak największym stopniu były użyteczne dla wszystkich interesariuszy projektu). Grupę docelową projektu stanowi – wnioskodawca (użytkownik) i mieszkańcy regionu. Status przedsiębiorstwa wnioskodawcy (MŚP). Wnioskodawca uprawniony do otrzymania wsparcia. Projekt zgodny z zasadami pomocy publicznej. (Polish)
0 references
The scope includes the construction of the oze installation (photovoltaic pcs. 1) with cabling, monitoring and other elements of the accompanying infrastructure and promotion of the project. Capacity installed in the project (748.80 kW), the amount of energy per year (761.00 MWh/year). Net value of the material scope – PLN 3801500,00 (PLN 4675845.00 gross), including qualified edition – PLN 3130858.30, subsidy PLN 2316835,14. The objectives of the project are in line with the strategic objectives of the development of the region and the objectives of the low-carbon economy, including, above all, increased production of renewable energies and reducing CO2 and other gases, increasing the level of environmental protection. The installation will be connected to the existing operator’s network. The infrastructure manager (the applicant) under the contract with the operator will partially drain the energy from the installation to the network. The aim of the project is to build installations and start up energy production from renewable sources and reduce CO2 emissions, increase the use of RES in energy production, move to a low carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in accordance with the objectives of ROP WŁ 2014-2020 (product and result indicators). The implementation of the project includes the construction and operation phase (within a shelf life of 3 years from the date of the final payment). The project provides emission reductions as avoided emissions (new installation) to meet strategic objectives through the production of energy from renewable sources (compatibility with SZOOP). The project retains the principles of the universal design concept (care for project effects as much as possible for all project stakeholders). The target group of the project is the applicant (user) and the inhabitants of the region. Status of the applicant’s enterprise (SMEs). The applicant entitled to receive support. A project compatible with the state aid rules. (English)
17 October 2020
0 references
Identifiers
RPLD.04.01.02-10-0148/18
0 references