No label defined (Q101786)

From EU Knowledge Graph
Revision as of 15:42, 17 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    1,395,275.31 zloty
    0 references
    334,866.07 Euro
    13 January 2020
    0 references
    1,885,507.17 zloty
    0 references
    452,521.72 Euro
    13 January 2020
    0 references
    74.0 percent
    0 references
    1 January 2020
    0 references
    31 December 2020
    0 references
    PAWEŁ JANOWSKI P.P.H.U. "BIG SPORT"
    0 references
    0 references

    51°36'32.0"N, 20°3'8.6"E
    0 references
    Zakres rzeczowy obejmuje budowę instalacji oze (fotowoltaiczna szt. 1) wraz z okablowaniem, monitoringiem i innymi elementami infrastruktury towarzyszącej oraz promocję projektu. Moce zainstalowane w projekcie (463,14 kW), ilość wytworzonej energii w projekcie (463,00 MWh/rok). Wartość netto zakresu rzeczowego – 2321500,00 zł (2855445,00 zł brutto), w tym wyd. kwalifikowane – 1885507,17 zł, dotacja 1395275,31 zł. Cele projektu są zbieżne z celami strategicznymi rozwoju woj. oraz celami gospodarki niskoemisyjnej, w tym przede wszystkim zwiększona produkcja energii ze źródeł odnawialnych i ograniczenie emisji CO2 i innych gazów, podwyższenie poziomu ochrony środowiska. Instalacja będzie podłączona do istniejącej sieci operatora. Podmiot zarządzający infrastrukturą (wnioskodawca) na mocy umowy z operatorem będzie w całości odprowadzał energię z instalacji do sieci. Celem działań w projekcie jest budowa instalacji i uruchomienie produkcji energii ze źródeł odnawialnych i ograniczenie emisji CO2, wzrost wykorzystania OZE w produkcji energii, przejście na gospodarkę niskoemisyjną i zmniejszenie udziału energetyki konwencjonalnej. Cele projektu odzwierciedlają zdefiniowane potrzeby interesariuszy i zostały określone mierzalnymi wskaźnikami zgodnie z celami RPO WŁ 2014-2020 (wskaźniki produktu i rezultatu). Realizacja projektu obejmuje fazę budowy oraz eksploatacji (w okresie trwałości 3 lat od daty płatności końcowej). Projekt zapewnia ograniczenie emisji jako emisja uniknięta (nowa instalacja) służąc realizacji celów strategicznych poprzez produkcję energii ze źródeł odnawialnych (zgodność z SZOOP). W projekcie zachowano zasady koncepcji projektowania uniwersalnego (dbałość aby efekty projektu w jak największym stopniu były użyteczne dla wszystkich interesariuszy projektu). Grupę docelową projektu stanowi – wnioskodawca (użytkownik). Status przedsiębiorstwa wnioskodawcy (MŚP). Wnioskodawca uprawniony do otrzymania wsparcia. Projekt zgodny z zasadami pomocy publicznej (Polish)
    0 references
    The material scope includes the construction of oze installations (photovoltaic pcs. 1) together with cabling, monitoring and other elements of the accompanying infrastructure and the promotion of the project. Power installed in the project (463.14 kW), the amount of energy generated in the project (463.00 MWh/year). Net value of the material scope – PLN 2321500,00 (PLN 2855445.00 gross), including qualified edition – PLN 1885507.17, subsidy PLN 1395275,31. The objectives of the project are in line with the strategic objectives of the development of the region and the objectives of the low-carbon economy, including, above all, increased production of renewable energies and reducing CO2 and other gases, increasing the level of environmental protection. The installation will be connected to the existing operator’s network. The infrastructure manager (the applicant) under the contract with the operator will completely drain the energy from the installation to the network. The aim of the project is to build installations and start up energy production from renewable sources and reduce CO2 emissions, increase the use of RES in energy production, move to a low carbon economy and reduce the share of conventional energy. The objectives of the project reflect the defined needs of stakeholders and have been defined by measurable indicators in accordance with the objectives of ROP WŁ 2014-2020 (product and result indicators). The implementation of the project includes the construction and operation phase (within a shelf life of 3 years from the date of the final payment). The project provides emission reductions as avoided emissions (new installation) to meet strategic objectives through the production of energy from renewable sources (compatibility with SZOOP). The project retains the principles of the universal design concept (care for project effects as much as possible for all project stakeholders). The target group of the project is – the applicant (user). Status of the applicant’s enterprise (SMEs). The applicant entitled to receive support. Project compatible with State aid rules (English)
    17 October 2020
    0 references

    Identifiers

    RPLD.04.01.02-10-0093/18
    0 references