No label defined (Q102142)

From EU Knowledge Graph
Revision as of 00:33, 16 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    5,928,030.2 zloty
    0 references
    1,422,727.25 Euro
    13 January 2020
    0 references
    6,974,153.18 zloty
    0 references
    1,673,796.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 November 2016
    0 references
    28 September 2018
    0 references
    MIASTO SKIERNIEWICE
    0 references
    0 references

    51°57'29.2"N, 20°8'41.6"E
    0 references
    PRZEDSIĘWZIĘCIE BĘDZIE POLEGAŁO NA STWORZENIU INFRASTRUKTURY TURYSTYCZNEJ W POSTACI WYZNACZENIA SZLAKU TURYSTYCZNEGO I REKREACYJNEJ NA TERENACH WOKÓŁ ZALEWU ZADĘBIE W SKIERNIEWICACH. NA REALIZACJĘ PRZEDSIĘWZIĘCIA BĘDZIE SKŁADAŁO SIĘ KILKA ZADAŃ: 1. WYZNACZENIE TRASY WYCIECZKOWEJ TRASA BĘDZIE PROWADZIĆ PRZEZ NAJBARDZIEJ ATRAKCYJNE PUNKTY MIASTA. W CIĄGU TRASY ZOSTANIE PRZYGOTOWANY QUEST – ZWIEDZANIE POŁĄCZONE Z ROZWIĄZYWANIEM QUIZÓW/ZAGADEK, O RÓŻNYCH STOPNIACH TRUDNOŚCI. W CIĄGU TRASY PLANOWANE JEST UTWORZENIE CERTYFIKOWANEGO PIT. 2. WYBUDOWANIE ŚCIEŻKI PIESZO-ROWEROWEJ WOKÓŁ BRZEGÓW ZBIORNIKA ZAPROJEKTOWANA ZOSTANIE ŚCIEŻKA PIESZO-ROWEROWA O NAWIERZCHNI ASFALTOWEJ I SZEROKOŚCI 4,0 M I DŁ. OK. 4,5KM. WYBUDOWANE ZOSTANĄ 3 ZJAZDY ROWEROWE DO ŚCIEŻKI. 3. MODERNIZACJA ISTNIEJĄCEJ PLAŻY ZAPLANOWANO USTAWIENIE SEGMENTÓW SANITARNO-HIGIENICZNYCH Z NATRYSKAMI, WĘZŁAMI SANITARNYMI ORAZ POMIESZCZENIA WC. DO SEGMENTU ZOSTANIE DOPROWADZONA SIEĆ WOD-KAN, ORAZ ELEKTRYCZNA. NA DACHU ZOSTANIE ZAMONTOWANA INSTALACJA FOTOWOLTAICZNA PV O MOCY MIN. 3KWP, BĘDZIE ZASILAŁA POWIETRZNE POMPY CIEPŁA DO CELÓW C.W.U. 4. LINOWY ELEKTRYCZNY WYCIĄG NART WODNYCH ZAPLANOWANO BUDOWĘ PRZENOŚNEGO WYCIĄGU 2 SŁUPOWEGO, OPARTEGO NA 2 PYLONACH. W SKŁAD WYCIĄGU WEJDĄ M.IN: KOTWY ODCIĄGOWE, KOMPLET PRZESZKÓD, POMOST STARTOWY PŁYWAJĄCY WYŁOŻONY SZTUCZNĄ TRAWĄ, PIANKI, KAPOKI, NARTY I WAKEBOARDY, PONTON DO OBSŁUGI I KONSERWACJI PRZESZKÓD. 5. ELEMENTY MAŁEJ ARCHITEKTURY W WYZNACZONYCH MIEJSCACH PRZY ŚCIEŻCE ROWEROWO-PIESZEJ ZOSTANĄ ZAPROJEKTOWANE MIEJSCA WYPOCZYNKOWO-WIDOKOWE O NAWIERZCHNI Z KOSTKI BETONOWEJ, NA KTÓREJ USTAWIONE BĘDĄ ŁAWKI, STOJAKI NA ROWERY, KOSZE NA ŚMIECI, SIŁOWNIA NA POWIETRZU. PROJEKT JEST ZGODNY Z KONCEPCJĄ UNIWERSALNEGO PROJEKTOWANIA, OPARTEGO NA 7 REGUŁACH: UŻYTECZNOŚĆ DLA OSÓB O RÓŻNEJ SPRAWNOŚCI, ELASTYCZNOŚĆ W UŻYTKOWANIU, PROSTE I INTUICYJNE UŻYTKOWANIE, CZYTELNA INFORMACJA, TOLERANCJA NA BŁĘDY, WYGODNE UŻYTKOWANIE BEZ WYSIŁKU, WIELKOŚĆ I PRZESTRZEŃ ODPOWIEDNIE DLA DOST (Polish)
    0 references
    THE PROJECT WILL CONSIST OF THE CREATION OF A TOURIST INFRASTRUCTURE IN THE FORM OF A TOURIST AND RECREATIONAL ROUTE IN THE AREAS AROUND THE ZADĘBIE RESERVOIR IN SKIERNIEWICE. THE IMPLEMENTATION OF THE PROJECT WILL CONSIST OF SEVERAL TASKS: 1. THE ROUTE WILL TAKE YOU THROUGH THE MOST ATTRACTIVE POINTS OF THE CITY. A QUEST WILL BE PREPARED DURING THE TOUR – A TOUR COMBINED WITH SOLVING QUIZZES/RIDDLES, WITH DIFFERENT DEGREES OF DIFFICULTY. A CERTIFIED PIT IS PLANNED TO BE CREATED DURING THE TOUR. 2. THE CONSTRUCTION OF A FOOT-BIKE PATH AROUND THE BANKS OF THE RESERVOIR WILL BE DESIGNED ON FOOT-BIKE PATH WITH ASPHALT PAVEMENT AND WIDTH OF 4.0 M AND LENGTH. IT’S OKAY. IT’S 4,5 HORSEPOWER. 3 BICYCLE EXITS TO THE PATH WILL BE BUILT. 3. MODERNISATION OF THE EXISTING BEACH IS PLANNED TO SET UP SANITARY AND HYGIENIC SEGMENTS WITH SHOWERS, SANITARY NODES AND TOILET ROOMS. A WATER-CHANNEL AND AN ELECTRICAL NETWORK WILL BE ADDED TO THE SEGMENT. A PV PHOTOVOLTAIC INSTALLATION WITH A MINIMUM POWER OF 3KWP WILL BE INSTALLED ON THE ROOF AND WILL SUPPLY AIR HEAT PUMPS FOR C.W.U. 4. THE CABLE ELECTRIC WATER SKI LIFT IS PLANNED TO BUILD A PORTABLE 2 POLE LIFT, BASED ON 2 PYLONS. THE LIFT WILL BE COMPOSED OF M.IN: DRAIN ANCHORS, A SET OF OBSTACLES, FLOATING PLATFORM LINED WITH ARTIFICIAL GRASS, FOAMS, CAPS, SKIS AND WAKEBOARDS, A PONTOON FOR HANDLING AND MAINTENANCE OF OBSTACLES. 5. ELEMENTS OF SMALL ARCHITECTURE IN DESIGNATED PLACES ALONG THE CYCLE-PALL PATH WILL BE DESIGNED FOR RECREATIONAL AND VISUAL SPACES WITH CONCRETE CUBE PAVEMENT WITH BENCHES, BICYCLE STANDS, GARBAGE BINS, GYM IN THE AIR. THE DESIGN IS CONSISTENT WITH THE CONCEPT OF UNIVERSAL DESIGN, BASED ON 7 RULES: USABILITY FOR PEOPLE WITH VARYING EFFICIENCY, FLEXIBILITY IN USE, SIMPLE AND INTUITIVE USE, LEGIBLE INFORMATION, ERROR TOLERANCE, EFFORT-FREE USE, SIZE AND SPACE SUITABLE FOR ACCESS (English)
    16 October 2020
    0 references

    Identifiers

    RPLD.06.02.01-10-0019/16
    0 references