No label defined (Q84581)

From EU Knowledge Graph
Revision as of 15:07, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: remove_english_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
No label defined
Project in Poland financed by DG Regio

    Statements

    0 references
    2,210,812.29 zloty
    0 references
    530,594.95 Euro
    13 January 2020
    0 references
    2,696,112.55 zloty
    0 references
    647,067.01 Euro
    13 January 2020
    0 references
    82.0 percent
    0 references
    21 December 2017
    0 references
    31 December 2020
    0 references
    INSTYTUT ENERGETYKI INSTYTUT BADAWCZY
    0 references
    0 references
    0 references
    Projekt będzie realizowany w województwie mazowieckim, w Warszawie,przy ulicy Augustówka 36 na nieruchomości, którą Wnioskodawca włada na mocy użytkowania wieczystego. Niniejszy Projekt dotyczy kompleksowej głębokiej termomodernizacji budynku Instytutu Energetyki (IEn) w Warszawie. Cele, jakie w ramach Projektu zrealizuje Wnioskodawca to: Cel główny: zwiększenie efektywności energetycznej budynku Instytutu Energetyki w Warszawie. Cele szczegółowe: - zmniejszenie kosztów eksploatacji budynku Instytutu, dzięki oszczędności energii elektrycznej i cieplnej; - zmniejszenie zużycia energii końcowej i pierwotnej, potrzebnej do ogrzewania infrastruktury Instytutu; - wzrost czystości powietrza w otoczeniu budynku, poprzez redukcję emisji gazów cieplarnianych; - poprawa jakości korzystania z infrastruktury publicznej – poprawa komfortu pracy i przebywania w budynku. Osiągnięcie powyższych celów będzie możliwe poprzez przeprowadzenie następujących działań, stanowiących wydatki kwalifikowane Projektu o podanych wartościach (zł): - Prace przygotowawcze: dokumentacja aplikacyjna (studium wykonalności), Prace przygotowawcze: dokumentacja projektowo - techniczna (dokumentacja: techniczna, przetargowa, projektowa, przyrodnicza), Roboty budowlane: Ocieplenie ścian szczytowych – 1419,15 m2; Ocieplenie dachu nad klatką schodową oraz maszynownią – 96,25 m2; Wymiana drzwi zewnętrznych – 24,52 m2; Ocieplenie stropodachu niewentylowanego 788,64 m2; Wymiana okien klatki schodowej - 14,04 m2; Ocieplenie ścian osłonowych – 1827,73 m2; Ocieplenie ścian cokołowych piwnic – 141,0 m2; Modernizacja instalacji c.w.u. – 1 kpl.; Modernizacja instalacji c.o. – 1 kpl. Budowa nadachowej instalacji PV – 39,96 kWp; Wymiana oświetlenia – 1 kpl., Promocja Projektu, Nadzór inwestorski, Audyt ex-post. (Polish)
    0 references
    The project will be implemented in the Mazowieckie Voivodship, Warsaw, at Augustówka 36 on the property, which the Applicant controls on the basis of perpetual use. This Project concerns comprehensive thermal modernisation of the building of the Institute of Energy (IEn) in Warsaw. The objectives to be pursued by the Applicant within the Project are: Main objective: increase the energy efficiency of the building of the Institute of Energy in Warsaw. Specific objectives: — reducing the operating costs of the Institute building, thanks to the savings of electricity and heat; — reducing the final and primary energy consumption needed to heat the Institute’s infrastructure; — increased air purity in the surroundings of the building, by reducing greenhouse gas emissions; — improving the use of public infrastructure – improving the comfort of work and staying in the building. The above objectives can be achieved by carrying out the following actions, constituting eligible expenditure of the Project with the stated values (PLN): Preparatory work: application documentation (feasibility study), preparatory work: technical and design documentation (documentation: technical, tender, design, natural), Construction works: Warming of the peak walls – 1419,15 m²; Roof warming over the stairway and engine room – 96,25 m²; Replacement of external doors – 24,52 m²; Warming of non-ventilated trophode 788,64 m²; Replacement of stairway windows – 14,04 m²; Wall warming – 1827,73 m²; Warming of the base walls of cellars – 141,0 m²; Modernisation of the installation of c.w.u. – 1 kpl.; Modernisation of the central heating system – 1 kpl. Construction of PV – 39,96 kWp; Lighting exchange – 1 kpl., Project Promotion, Investor Oversight, Ex-post Audit. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.01.03.01-00-0084/17
    0 references