Construction of the Municipal Waste Collection Point (PSZOK) within the Municipality of Radomia (Q85127)

From EU Knowledge Graph
Revision as of 15:02, 14 October 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 1 language: translated_label)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of the Municipal Waste Collection Point (PSZOK) within the Municipality of Radomia
Project in Poland financed by DG Regio

    Statements

    0 references
    2,150,340.17 zloty
    0 references
    516,081.64 Euro
    13 January 2020
    0 references
    2,529,811.97 zloty
    0 references
    607,154.87 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2020
    0 references
    GMINA MIASTA RADOMIA
    0 references
    0 references
    0 references
    Projekt polega na budowie stacjonarnego Punktu Selektywnego Zbierania Odpadów Komunalnych(PSZOK).Realizowany będzie w woj.maz.,w m.Radom – płd. część,w odległości ok.3km od centr. części miasta,na dz. o nr ewid.:2/6,3/4,3/5,208/8,85/6,84,85/8,położonych przy ul.Wjazdowej(mapa lokalizacji inwestycji-zał.nr5 do WoD).Grunty są własnością Gminy Miasta Radomia(GMR). Zakres proj.obejmują zadania: 1.Prace przygot.(50700,00zł netto; 62361,00zł brutto): -studium wykonalności(SW),-wniosek o dof.(WoD), -program funkcjonalno-użytkowy(PFU)z koncepcją, 2.Dokumentacja proj.(95875,00zł netto; 117926,25zł brutto): -Projekty wraz z kompletem uzgodnień i pozwoleniem na budowę -DTR,Instrukcje Technologiczne,Instrukcje stanowiskowe,Dokumentacja i UDT,Instrukcje BPH i p.poż. -Dok. powykonawcza -Dok. do uzyskania pozwolenia na użytk. wraz z pozwoleniem 3.Roboty budowlane(2282730,00zł netto;2807757,90zł brutto): -Powierzchnia utwardzona pod pow. rampy wielofunk. -Przyłącze mediów-energia elektryczna -Przyłącze i rozprowadzenie mediów–wodociąg -Kanalizacja deszczowa -Ogrodzenie terenu -Brama wjazdowa -Sieci teletechniczne -Zagosp. terenu,roboty wykończeniowe i remontowe -Wjazd(zjazd)z drogi publicz. -Budynek biurowo-socjalny(kontener) -Kontenery i pojemniki PSZOK -Dostawa i wyposażenie ścieżki edukac. -Dostawa i montaż wagi samochodowej 18t -Dostawa i montaż wagi platformowej 300kg -Wyposażenie warsztatu 4.Nadzór budowlany(34240,95zł netto;41116,36zł brutto): -nadzór nad realizacją 5.Informacja i promocja(99966,02zł netto;119268,20zł brutto): -działania informac.-promoc. -tablica informac.i pamiątk. (Polish)
    0 references
    The project consists of the construction of a stationary Municipal Waste Collection Point (PSZOK).It will be carried out in the voivodeship of maz.,in m.Radom – south part, within a distance of approx.3 km from the center of the part of the city, at the centre of the part of the city, on the number of register no.:2/6,3/4,3/5,208/8,85/6,84,85/8, located at Wjazdowa Street(the map of the location of the investment-Zal). The scope of the project includes tasks: 1.Works prepared.(50700.00PLN net; 62361.00PLN gross: —feasibility study(SW),-application for DOF.(WoD), -functional-use programme(PFU) with concept, 2.Project documentation (PLN 95875.00 PLN net; 117926.25PLN gross: —Projects with a complete set of arrangements and building permit – DTR,Technological Instructions, Stand Instructions, Documentation and UDT,Instructions BPH and p. fire. —Construction doc. -Doc. to obtain a land permit. together with the permit 3.Construction works (PLN 2282730.00 PLN;2807757.90 PLN gross): —The surface hardened under the multifunk ramps. —Media connection-electricity -Connecting and dismantling of the media-water pipeline – Rainwater channelling – Terrain fence -Entry gate -Telecommunications networks – Land management, finishing and repair work -Entrance(exit)from the public road. — Office and social building (container) – Containers and containers PSZOK -Delivery and equipment of the educational path. —Delivery and assembly of car scale 18 t -Delivery and assembly of platform scale 300 kg – Workshop equipment 4.Construction supervision (PLN 34240.95 PLN net;41116.36 PLN gross): —supervision on implementation of 5.Information and promotion (PLN 99966.02 PLN;PLN 119268.20 gross): —activities informac.-promotion. —a table informac. and souvenirs. (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.02.00-00-0012/17
    0 references