(10360.14072017.115000015) LOW-POWER SWIMMING POOL (Q2056934)

From EU Knowledge Graph
Revision as of 12:07, 2 November 2020 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in 2 languages: Changing unique label-description pair)
Jump to navigation Jump to search
Project Q2056934 in Italy
Language Label Description Also known as
English
(10360.14072017.115000015) LOW-POWER SWIMMING POOL
Project Q2056934 in Italy

    Statements

    0 references
    53,323.23 Euro
    0 references
    154,492.9 Euro
    0 references
    34.52 percent
    0 references
    30 March 2018
    0 references
    30 March 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI MASSA MARITTIMA
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    INTERVENTO 1: SOSTITUZIONE DELLE DUE CALDAIE UNICAL PRESENTI CON 4 MODULI DI CALDAIE A CONDENSAZIONE IN LINEA. L'INSTALLAZIONE DI QUESTE PREVEDE ANCHE L'INSTALLAZIONE DI DUE KIT INAIL, VISTO E CONSIDERATO CHE QUELLI PRESENTI NON SONO IN OTTIME CONDIZIONI, E L'INSTALLAZIONE DI UNO SCAMBIATORE CALDAIE PER IMPEDIRE LA CONTAMINAZIONE DELL'ACQUA DELLE CALDAIE DA PARTE DEI DEPOSITI DI CALCARE E DI SPORCO PRESENTI NELL'INTERO IMPIANTO.INTERVENTO 2: INSTALLAZIONE DI DUE POMPE DI CALORE A GAS IN PARALLELO ALLE CALDAIE A CONDENSAZIONE, PER SODDISFARE IL FABBISOGNO TERMICO DELLA PISCINA(INTERVENTO NON AMMISSIBILE).INTERVENTO 3: SOSTITUZIONE DELLE POMPE DEL CIRCUITO, ORMAI GIUNTE A FINE VITA UTILE, CON NUOVE POMPE PI? EFFICIENTI .INTERVENTO 4: INSTALLAZIONE DI NUOVI QUADRI ELETTRICI E DI NUOVE LINEE ELETTRICHE ED ALLACCIO/MODIFICA LINEE ELETTRICHE ESISTENTI. INTERVENTO 5: INSTALLAZIONE SISTEMA DI FILTRAGGIO ED ADDOLCIMENTO ACQUA. INTERVENTO 6. RIMOZIONE DEL SERBATOIO INERZIALE U.T.A. SPOGLIATOI E (Italian)
    0 references
    ACTION 1: REPLACEMENT OF THE TWO UNICAI BOILERS WITH 4 MODULES OF IN-LINE CONDENSING BOILERS. THE INSTALLATION OF THESE PIPES ALSO INCLUDES THE INSTALLATION OF TWO INAIL KITS, SEEN AND GIVEN THAT THOSE PRESENT ARE NOT IN A VERY GOOD CONDITION, AND THE INSTALLATION OF A BOILER TANK TO PREVENT WATER CONTAMINATION OF THE BOILERS BY THE DEPOSITS OF LIMESTONE AND SOIL IN THE ENTIRE IMTO.INTERVENTO 2: INSTALLATION OF TWO GAS HEAT PUMPS IN PARALLEL WITH CONDENSING BOILERS TO MEET THE HEAT DEMAND OF THE POOL (NON-ELIGIBLE INTERVENTION).INTERVENTO 3: THE REPLACEMENT OF THE EXISTING PUMPS OF THE LOOP, WHICH HAS NOW REACHED THE END OF ITS USEFUL LIFE, WITH NEW PIPS? EFFECTIVENESS 4: INSTALLATION OF NEW ELECTRICAL SWITCHBOARDS, NEW POWER LINES AND CONNECTION/MODIFICATION OF EXISTING POWER LINES. ACTION 5: INSTALLATION OF FILTRATION SYSTEM AND WATER SWEETENING. MEASURE 6. REMOVAL OF THE UTO INERTIAL RESERVOIR AND THE CHANGING ROOMS, AND (English)
    0 references

    Identifiers