Language Label Description Also known as
English
Thermal modernisation of the building at ul. Żeromskiego 2B
Project in Poland financed by DG Regio

    Statements

    0 references
    1,405,499.86 zloty
    0 references
    337,319.97 Euro
    13 January 2020
    0 references
    1,735,399.26 zloty
    0 references
    416,495.82 Euro
    13 January 2020
    0 references
    80.99 percent
    0 references
    12 January 2017
    0 references
    31 December 2019
    0 references
    GMINA ELBLĄG
    0 references
    0 references

    54°11'56.0"N, 19°26'28.0"E
    0 references
    Projekt przewiduje kompleksową termomodernizację w budynku będącym własnością Gminy Elbląg, przy ul. Żeromskiego 2B. Projekt dotyczy budynku wykorzystywanego głównie na potrzeby w zakresie ochrony zdrowia. Budynek jest wpisany do rejestru zabytków pod numerem 242/92 dnia 24.12.1992 r Projekt można podzielić na dwa etapy tj: 1) Prace przygotowawcze – dokumentacja projektowa, audyt energetyczny, studium wykonalności 2) Prace termomodernizacyjne. Elementem projektu będzie także zatrudnienie inżyniera kontraktu oraz działania promocyjne Przyjęty wariant projektu zakłada przeprowadzenie następujących prac termomodernizacyjnych: 1) Modernizacja instalacji c.o. Modernizacja obejmuje poprawę sprawności przesyłu poprzez montaż izolacji na rurociągach przesyłowych, montaż zaworów termostatycznych z inteligentnymi głowicami . 2) Ocieplenie dachu budynku materiałem termoizolacyjnym. 3) Wymiana stolarki okiennej (wszystkich okien w obiekcie) na nową oszkloną szybą zespoloną podwójną. 4) Ocieplenie ścian zewnętrznych przy gruncie budynku materiałem termoizolacyjnym wraz z warstwą fakturową na siatce. 5) Wymiana stolarki drzwiowej ( wszystkie drzwi zewnętrzne) na nową oszkloną szybą zespoloną podwójną. 6) Ocieplenie wszystkich ścian zewnętrznych budynku przy użyciu materiału termoizolacyjnego: Natrysk poliuretanowy o grubości minimum: 3 cm. Ocieplenie ścian dotyczy wszystkich ścian zewnętrznych kondygnacji naziemnych. W ociepleniu uwzględniono modernizację cokołu. Projekt wpisuje się w założenia określone w SzOOP RPO WiM dla Poddziałania 4.3.1 ponieważ w wyniku jego realizacji nastąpi zwiększanie efektywności energetycznej budynku, co jest zgodne z celami w/w działania. Ponadto projekt jest zgodny z oczekiwanymi efektami wsparcia dla Osi nr 4 tj: 1) Obniżeniem zużycia energii pierwotnej w budynkach publicznych i zapotrzebowania na ciepło w zabudowie mieszkaniowej. 2) Spadkiem emisji gazów cieplarnianych do atmosfery (Polish)
    0 references
    The project provides for a comprehensive thermal refurbishment of the building owned by the municipality of Elbląg to ul. Żeromskiego 2B. The project relates to a building used mainly for health purposes. The building is registered in the Register of Historical Monuments under No 242/92 on 24.12.1992. the project can be divided into two phases: 1) Preparatory work — design documentation, energy audit, feasibility study 2) Energy renovation works. The project will also include the employment of a contract engineer and promotional activities adopted by the adoption of the following renovation works: 1) The modernisation of the service installation involves improving transmission efficiency by installing transmission system insulation, installing thermostatic valves with smart heads. 2) insulation of the roof of the building with a thermal insulation material. 3) replacement of window frames (all windows in the facility) into a new double-glazed glass lens. (4) insulation of external walls on the building ground with the thermal insulation material, together with an invoice layer on a grid. 5) An exchange of door joinery (all external doors) into a new double-glazed block glass. (6) insulation of all external walls of the building using thermal insulation material: A polyurethane spray of a minimum thickness of: 3 cm. The warming of the walls applies to all sides of the outer surface of the ground floor. In the light of this, the modernisation of the countryside has been taken into account. The project is in line with the assumptions set out in the ROP WiM for sub-measure 4.3.1 because it will increase the energy efficiency of the building as a result of its implementation, which is in line with the objectives of the action. In addition, the project is in line with the expected effects of support to Axis 4, tj: 1) reducing primary energy consumption in public buildings and heating demand in housing. 2) decrease of greenhouse gas emissions into the atmosphere (English)
    0 references

    Identifiers

    RPWM.04.03.01-28-0027/17