Reduce low emissions and improve energy efficiency in Lats by thermo-modernisation of public buildings. (Q123917)

From EU Knowledge Graph
Revision as of 11:57, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Reduce low emissions and improve energy efficiency in Lats by thermo-modernisation of public buildings.
Project in Poland financed by DG Regio

    Statements

    0 references
    3,776,821.28 zloty
    0 references
    906,437.11 Euro
    13 January 2020
    0 references
    4,518,269.26 zloty
    0 references
    1,084,384.62 Euro
    13 January 2020
    0 references
    83.59 percent
    0 references
    25 July 2016
    0 references
    30 September 2020
    0 references
    GMINA ŁAZY
    0 references
    0 references

    50°25'39.4"N, 19°23'41.3"E
    0 references
    Zakres projektu obejmuje kompleksową termomodernizację 8 budynków użyteczności publicznej w Gminie Łazy: 1. ZOZ w Niegowonicach 2. SP w Grabowej 3. Budynek Użyteczności Publicznej (BUP) pełniący funkcje społeczno-kulturalne w Niegowonicach 4. Budynek Użyteczności Publicznej (BUP) pełniący funkcje społeczno-kulturalne w Ciągowicach 5. SP nr 1 w Łazach 6. Przedszkole ul. Topolowa w Łazach 7. Przedszkole ul. Kolejowa w Łazach 8. KTS w Łazach Łączny zakres prac obejmuje: - docieplenie budynku (w 8 budynkach), - wymianę okien i drzwi (w 8 budynkach), - wymianę źródła ciepła (w 3 budynkach), - modernizację instalacji c.o. (w 4 budynkach), - modernizację instalacji c.w.u. (w 3 budynkach), - wykonanie instalacji mechanicznej wentylacji z odzyskiem ciepła (w 1 budynku). Pod względem formalno-prawnym projekt jest gotowy do realizacji. (Polish)
    0 references
    The scope of the project includes a comprehensive thermal modernisation of the 8 public buildings in the municipality of Łazy: 1. ZOZ in Nieuwowice 2. SP in Grplowa 3. Public Utilities Building (BUP), which has a social and cultural function in Niogonice 4. Public Utilities Building (BUP), which has a social and cultural function at 5. SP 1 in Łać 6. Pre-school ul. Topolowa, Łaza7. Pre-school ul. Laza8 railway. In the Łami Łazaków the scope of the work includes: — insulation of the building (in 8 buildings), — replacement of windows and doors (in 8 buildings), — replacement of the heat source (in 3 buildings), — modernisation of the heating plant (in 4 buildings), — modernisation of the heating system (in buildings), — modernisation of the hot-water installations (in 3 buildings), — installation of a mechanical ventilation system with heat recovery (in 1 buildings). In formal and legal terms, the project is ready for implementation. (English)
    0 references

    Identifiers

    RPSL.04.03.01-24-050F/17
    0 references