Extension of the DW 948 Oświęcim-Kęty and DW 949 Brzeszech-Osiek (Q112992)

From EU Knowledge Graph
Revision as of 08:59, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Extension of the DW 948 Oświęcim-Kęty and DW 949 Brzeszech-Osiek
Project in Poland financed by DG Regio

    Statements

    0 references
    28,436,664.15 zloty
    0 references
    6,824,799.40 Euro
    13 January 2020
    0 references
    33,454,899.0 zloty
    0 references
    8,029,175.76 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    20 December 2017
    0 references
    31 December 2019
    0 references
    WOJEWÓDZTWO MAŁOPOLSKIE
    0 references
    Przedmiotem projektu jest zadanie polegające na opracowaniu dokumentacji projektowej wraz z uzyskaniem zgody właściwego organu na prowadzenie robót w oparciu o obowiązujące przepisy oraz wykonanie robót budowlanych.Roboty budowlane objęte projektem będą realizowane w oparciu o dwa zadaniaetapy:ZadanieEtap I obejmuje: rozbudowę DW 948, jako drogi klasy G, jednojezdniowej, 2pasowej i przebudowębudowę chodników oraz ciągów pieszo rowerowych, przebudowę skrzyżowań z drogami bocznymi na ronda, wzmocnienie skarp nasypów drogowych, przebudowę przepustów oraz oczyszczenie odmulenie pozostałych przepustów, budowę oświetlenia ulicznego oraz przebudowę obiektów inżynierskich na ciekach krzyżujących się z DW 948. Łączna długość odcinków, w tym przebudowa skrzyżowań, objętych rozbudową wynosi około 5,8 km. rozbudowę DW 949, jako drogi klasy G, jednojezdniowej, 2pasowej i poszerzenie jezdni, wzmocnienie skarp nasypów drogowych, przebudowę przepustów przebudowę drogi bocznej oraz przebudowę obiektów inżynierskich na ciekach krzyżujących się z DW 949, budowęrozbudowę odwodnienia drogi. Łączna długość odcinka objętego rozbudową wynosi około 1,3 km. ZadanieEtap II obejmuje: budowę nowego obiektu mostowego w ciągu DW 949 wraz z dojazdami, budowęprzebudowę przepustów oraz zjazdów, przebudowę ok. 0,6 km drogi DW 949 o parametrach określonych w PFU oraz koncepcji i spełniającymi wymagania parametrów drogi klasy G, o konstrukcji nawierzchni odpowiadającej 20letniemu okresowi eksploatacji, prawidłowego odwodnienia oraz rozwiązania obsługi komunikacyjnej przyległego terenu w zakresie ruchu kołowego i pieszego. Ponadto w zakresie inwestycji planowana jest przebudowa skrzyżowania DW 949 z DW 948 w m. Łęki wraz z odcinkiem drogi DW 949 obejmująca budowę pasa do prawoskrętu na DW 949 i pasa włączenia do DW 948.Z uwagi na ograniczoną ilość znaków w polu C.2.2. dodatkowe informacje zawarto w pkt Q. (Polish)
    0 references
    The project involves the drafting of project documentation with the approval of the competent authority to carry out works on the basis of the rules in force and construction of construction works. the project works will be carried out on the basis of two phases: extension of DW 948, as a class G, single-carriageway, 2lane and re-construction of pavements and cycle paths, upgrading junctions with lateral roads on the roundabout, reinforcing road embankments, upgrading culverts and cleaning up other culverts, construction of street lighting, and reconstruction of engineering structures on cross courses with the DW 948. The total length of the sections, including upgrading the intersections, covered by the extension, is approximately 5.8 km. extension of DW 949, as a class of G, single-carriageway, 2lane and widening of the road, strengthening the road embankments, the reconstruction of the side road, and the conversion of engineering structures on cross courses with the DW 949, construction of road drainage. The total length of the covered area is approximately 1.3 km. The following shall be included in the second phase: construction of a new bridge structure in the course of the DV 949 with the entrances, construction of culverts and entries, upgrading of around 0.6 km of road 949 with the parameters defined in the PFU and the concepts and parameters of the Class G road, the construction of a pavement corresponding to the 20-year period of operation, the correct dehydration and the solution to the communication of the surrounding road and pedestrian area. In addition, in the area of investment, it is planned to rebuild the junction of the DW 949 with the DV 948 in m. a junction with the section of the DW 949 road, including the construction of the lane for the right hand to the DW 949 and the belt to be inserted in the DV 948.Given the limited character of the characters in field C.2.2. the additional information is provided in section Q. (English)