Replacement of boilers using gaseous fuels in individual households in the municipality of Tymbark. (Q112384)

From EU Knowledge Graph
Revision as of 08:44, 24 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Replacement of boilers using gaseous fuels in individual households in the municipality of Tymbark.
Project in Poland financed by DG Regio

    Statements

    0 references
    694,303.23 zloty
    0 references
    166,632.78 Euro
    13 January 2020
    0 references
    704,847.0 zloty
    0 references
    169,163.28 Euro
    13 January 2020
    0 references
    98.5 percent
    0 references
    16 February 2017
    0 references
    31 December 2019
    0 references
    GMINA TYMBARK
    0 references
    0 references
    Przedmiotem projektu jest wymiana 50 szt. kotłów opalanych węglem, służących indywidualnym gospodarstwom domowym z terenu Gminy Tymbark do wytwarzania ciepła dla potrzeb grzewczych oraz przygotowania c.w.u. W miejsce starych kotłów zaplanowano montaż kotłów gazowych: 46 szt. oraz opalanych biomasą: 4 szt. Ich liczba oraz rodzaj wynikają z zapotrzebowania zgłoszonego przez mieszkańców.Specyfika projektu w działaniu 4.4.2 typ A decyduje o tym, iż parametry kotłów takie jak moc, sprawność itd. zostaną dobrane po przeprowadzeniu audytów energetycznych, odpowiednio do zapotrzebowania danego budynku wynikającego z: poziomu docieplenia, powierzchni, liczby użytkowników oraz dotychczasowego zużycia paliwa. Audyty zostaną przeprowadzone przez wskazanych przez IZ audytorów, a wszystkie urządzenia spełniać będą wymogi ekoprojektu, a po ich instalacji spełnione zostaną wymogi co do poziomu zużycia Ep przez dany budynek. W związku z planowaną wymianą kotłów zajdzie konieczność wymiany części wewn. instalacji cieplnych w budynkach. Po sporządzeniu audytów zostaną określone szczegółowe warunki techn. i wskazane budynki, w których będzie wymieniana instalacja.Kalkulację kosztów wymiany źródła ciepła oraz instalacji wewn. sporządzono zgodnie z zasadami dofinansowania: 1 dla kotłów 350złkW mocy, maks. do mocy wyznaczonej w audycie i nie więcej niż 8 tys. złkocioł, tu: śr. ok. 22,7kWkocioł i cena 8000 zł kocioł; 2 dla instalacji przyjęto cenę średnio 5312,35 złkocioł, przy założeniu, że instalacje będą wykonane we wszystkich budynkach.Ponadto projekt przewiduje realizację działań na rzecz podniesienia świadomości ekologicznej mieszkańców. W ramach przysługującego limitu kosztów pośrednich zaplanowano promocję projektu, a także koszty zarządzania i usługi w zakresie obsługi techn. Koszty przygotowawcze objęły przygotowanie analizy ekonomiczno finansowej.W ramach montażu finansowego wkład własny pochodzić będzie z budżetu Wnioskodawcy. (Polish)
    0 references
    The project involves the replacement of 50 coal fired boilers for individual households in the municipality of Tymbark to generate heat for the heating and preparation of hot water boilers. 46 and biomass-fired: 4 units Their number and type are based on the demand notified by the residents. the specificity of the project in Action 4.4.2 A determines that the parameters of the boilers such as power, efficiency, etc. will be selected after performing the energy audits, according to the requirements of the building in question, as a result of: insulation level, surface area, number of users and existing fuel consumption. The audits will be carried out by the auditors designated by the MA and all the equipment will meet the ecodesign requirements and, after their installation, meet the requirements as to the level of Ep of the building. In connection with the planned replacement of boilers, the replacement of thermal installations in buildings will need to be replaced. Once the audits have been drawn up, detailed conditions will be specified and the selected buildings will be replaced. the calculation of the cost of replacement of the heat source and of the installation shall be done in accordance with the grant rules: 1 for power boilers 350zkW, up to the maximum power indicated in the audit and not more than PLN 8, plum ca. 22,7kWboiler and price of PLN 8000 boiler; 2 for the installation, the average cost of the boiler was 5312,35, assuming that the installations will be installed in all buildings. in addition, the project provides for the implementation of actions to increase the awareness of the population. Within the limit of indirect costs, the project promotion as well as the costs of management and maintenance services are planned. The preparatory costs included the preparation of an economic and financial analysis. as part of the financial installation, the own contribution will come from the applicant’s budget. (English)
    0 references

    Identifiers

    RPMP.04.04.02-12-0217/17
    0 references