Solar installations as a source of renewable energy in the municipality of Tehran (Q104650)

From EU Knowledge Graph
Revision as of 22:45, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Solar installations as a source of renewable energy in the municipality of Tehran
Project in Poland financed by DG Regio

    Statements

    0 references
    3,523,892.81 zloty
    0 references
    845,734.27 Euro
    13 January 2020
    0 references
    4,145,756.25 zloty
    0 references
    994,981.5 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2016
    0 references
    30 October 2019
    0 references
    GMINA TERESZPOL
    0 references
    Celem głównym projektu jest upowszechnienie technologii wytwarzania czystej energii wśród mieszkańców poprzez powszechny montaż OZE na terenie gm. Tereszpol. Realizacja projektu posłuży również dywersyfikacji źródeł pozyskiwania energii cieplnej, a tym samym poprawie bezpieczeństwa energetycznego mieszkańców gminy. Ponadto wzrost wytwarzania energii cieplnej z OZE przyczyni się bezpośrednio do redukcji zanieczyszczenia powietrza atmosferycznego i poprawy jego jakości. Stanie się to dzięki zmniejszeniu emisji gazów cieplarnianych do atmosfery. W konsekwencji inwestycja w rozwój instalacji OZE poprawi komfort życia mieszkańców m.in. poprzez zmniejszenie obciążeń finansowych społeczności lokalnej oraz podniesie atrakcyjność społeczno-gospodarczej gminy. W ramach projektu na terenie gminy Tereszpol zostanie zamontowanych 445 instalacji OZE, w tym 415 instalacji kolektorów słonecznych oraz 30 powietrznych pomp ciepła. Zestawy kolektorów słonecznych będą składały się z 2 lub 3 absorberów, o łącznej mocy od 3,4 kW 5,2 kW. Pompy powietrza będą posiadały moc 3,5 kW. W wyniku realizacji projektu dodatkowa zdolność wytwarzania energii z OZE na terenie gminy wyniesie 1,939 MW, a produkcja energii cieplnej z nowo wybudowanych instalacji wytwórczych wykorzystujących OZE osiągnie wartość 719,52 MWh/rok. Szacuje się także, że dzięki zainstalowaniu nowowybudowanych OZE roczny spadek emisji gazów cieplarnianych wyniesie 397,775 ton ekwiwalentu CO2. Planowana inwestycja jest zgodna szeregiem dokumentów strategicznych wykazanych w niniejszym wniosku w punkcie 2.11, zapisami Strategii Rozwoju Gminy Tereszpol , Planu Gospodarki Niskoemisyjnej dla gm. Tereszpol oraz Programem ochrony powietrza dla strefy lubelskiej (POP) Na podstawie tego Programu w gminie Tereszpol nie stwierdzono przekroczenia chociażby jednego poziomu dopuszczalnego lub docelowego w odniesieniu do substancji podlegających ocenie jakości powietrza. Pomimo tego projekt wpisuje się w ogólne kierunki działań POP. (Polish)
    0 references
    The main aim of the project is to spread the technology of producing clean energy to the population through the universal assembly of renewables in the land area of the Teadzpol site. The project will also contribute to the diversification of sources of heat generation, thereby improving the energy security of the inhabitants of the municipality. In addition, the increase in the generation of heat from RES will directly reduce and improve ambient air pollution. This will be done by reducing the greenhouse gas emissions to the atmosphere. As a result, the investment in the development of RES installations will improve the standard of living of the inhabitants, inter alia by reducing the financial burden on local communities and increasing the socio-economic attractiveness of the municipality. Within the project within the territory of the municipality, 445 RES installations will be installed, including 415 solar collectors installations and 30 heat pumps. The solar collectors shall consist of 2 or 3 absorbers, having a total power between 3.4 kW and 5.2 kW. Air pumps shall have a power of 3.5 kW. As a result of the project, the additional renewable energy generation capacity in the municipality will be 1.939 MW and the heat generation from newly built RES generating installations will reach 719.52 MWh/year. It is also estimated that an annual reduction in greenhouse gas emissions will result in an annual reduction in greenhouse gas emissions of 397,775 tonnes of CO2 equivalent. The planned investment is in line with a number of strategic documents referred to in this proposal in point 2.11 of this proposal, the provisions of the Development Strategy of the Municipality of Tereszpol, the Low Carbon Economy Plan and the Air Protection Programme for the Lublin Zone (POP). Despite this, the project is part of the broad lines of the POP action. (English)
    0 references

    Identifiers

    RPLU.04.01.00-06-0025/16
    0 references