Construction of water and sanitation infrastructure in Dorohusk — Phase II (Q105573)

From EU Knowledge Graph
Revision as of 22:41, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of water and sanitation infrastructure in Dorohusk — Phase II
Project in Poland financed by DG Regio

    Statements

    0 references
    3,073,029.2 zloty
    0 references
    737,527.01 Euro
    13 January 2020
    0 references
    3,615,328.5 zloty
    0 references
    867,678.84 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 April 2019
    0 references
    30 November 2019
    0 references
    GMINA DOROHUSK
    0 references
    Przedmiotem projektu jest budowa sieci wodociągowej na terenie gminy Dorohusk. Trasa sieci infrastruktury przebiegać będzie przez 7 miejscowości objętych projektem: Dobryłówka, Ludwinów, Okopy, Okopy Kolonia, Rozkosz, Wólka Okopska i Zamieście. Projektem zostaną objęci mieszkańcy (grupa docelowa projektu), którzy nie mają dostępu do sieci wodociągowej, zaopatrujący się w wodę we własnym zakresie (przydomowe studnie kopane lub głębinowe). Większość mieszkańców korzysta z pozyskania wody pasami transmisyjnymi- co nie spełnia warunków sanitarnych i jest uciążliwe w warunkach zimowych. Niski stan wyposażenia gminy w infrastrukturę wodociągową prowadzi do pogorszenia warunków życia mieszkańców, obniżenia atrakcyjności inwestycyjnej gminy oraz pogorszenia stanu środowiska naturalnego. Zakładane rezultaty projektu to przede wszystkim: 13 598,5m nowo wybudowanej sieci wodociągowej, dostęp 64 mieszkańców gminy do bieżącej wody, podniesienie atrakcyjności gminy dla przyszłych inwestorów jak i turystów, poprawa środowiska naturalnego. Zaplanowane zadania w projekcie polegają na przeprowadzeniu prac budowlanych dotyczących rozbudowy nowej sieci wodociągowej, uruchomienie serwisów, za pośrednictwem których użytkownicy będą mogli dokonywać transakcji on-line (w tym zawieranie umów, odczyty liczników, pobieranie opłat, stan rozliczeń, uwagi i skargi, zapytania, dostępność dotychczasowych i nowych usług itp. w ramach istniejącego systemu ICT funkcjonującego w gminie). Wszystkie prace zostaną przeprowadzone w sposób zapewniający zachowanie równowagi środowiska naturalnego. Wnioskodawca informuje, iż na terenie objętym projektem funkcjonuje prawidłowe zagospodarowanie powstałych nieczystości - przydomowe oczyszczalnie ścieków. (Polish)
    0 references
    The project is the construction of a water mains network in the municipality of Dorohusk. The infrastructure network will run through 7 project localities: Dobrylka, Ludwins, trenches, Kolonia, rozosz, Wólka Okopska and Zatown. The project will be targeted at the inhabitants (target group) who do not have access to the water supply network, which supplies themselves to the water themselves (domestic fossil or deep-water wells). The majority of the population is using transmission belts for transmission, which does not meet the sanitary conditions and is burdensome in the winter. The low state of equipment of a municipality in water supply infrastructure leads to a deterioration in the living conditions of the inhabitants, a reduction in the attractiveness of the municipality’s investment and a deterioration in the state of the environment. The project’s expected results are mainly: 13 598.5 m newly built water supply network, access of 64 inhabitants of the municipality to tap water, increasing the attractiveness of the municipality to future investors and tourists, improving the environment. The planned tasks of the project consist of building works for the extension of the new water supply network, the provision of services through which users will be able to carry out on-line transactions (including the conclusion of contracts, reading of meters, collection of fees, situation of settlements, observations and complaints, requests, availability of existing and new services, etc., within the existing ICT system in place in the municipality). All works will be carried out in such a way that the balance of the environment is preserved. The applicant points out that the project site is responsible for the correct management of the uncontaminated waste water treatment plants. (English)