Integrated system to ensure continuity of supply in the context of the operation of the distribution network (Q80185)

From EU Knowledge Graph
Revision as of 02:46, 23 September 2020 by DG Regio (talk | contribs) (‎Changed an Item: Fixing rounding issue)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Integrated system to ensure continuity of supply in the context of the operation of the distribution network
Project in Poland financed by DG Regio

    Statements

    0 references
    3,876,695.83 zloty
    0 references
    930,407.00 Euro
    13 January 2020
    0 references
    7,141,789.25 zloty
    0 references
    1,714,029.42 Euro
    13 January 2020
    0 references
    54.28 percent
    0 references
    1 June 2019
    0 references
    31 May 2022
    0 references
    PGE DYSTRYBUCJA S.A.
    0 references
    0 references

    51°13'5.5"N, 22°33'16.9"E
    0 references
    Przedmiotem projektu jest opracowanie modułowego zestawu urządzeń, dzięki którym możliwe będzie ograniczenie przerw w dostawie energii elektrycznej do odbiorców końcowych. Proponowane rozwiązanie - System bezprzerwowego zasilania odbiorców (SBZO), pozwoli na maksymalizację ciągłości dostaw elektryczności zarówno podczas planowanych prac remontowych związanych z modernizacją infrastruktury sieci dystrybucyjnej, jak i podczas prac związanych z usuwaniem awarii. Główne elementy układu to: rozdzielnica z transformatorem SN/nN oraz systemem przyłączeniowym (moduł 1), układ przekształtników oraz akumulator energii (moduł 2), agregaty prądotwórcze (moduł 3). Z uwagi na wykorzystanie nowoczesnych rozwiązań technologicznych tj. falowników dużej mocy, zasobnika energii, układu synchronizacji z siecią oraz realizacji połączeń w technologii prac pod napięciem (PPN) możliwe będzie bezprzerwowe przechodzenie zasilania z sieci dystrybucyjnej na zasilanie z SBZO i odwrotnie oraz rezerwowe zasilanie dużej ilości odbiorców w tym odbiorców o niespokojnym charakterze odbiorników przy zachowaniu selektywności działania zabezpieczeń. Opisywane rozwiązanie skierowane jest do Operatorów Sieci Dystrybucyjnych (OSD). Prace nad powyższymi kwestiami motywowane są potrzebą realizacji istotnych elementów strategii firm dystrybucyjnych, które wynikają m.in. z konieczności dostosowania się do obowiązujących aktów prawnych. Implementacja opisywanego rozwiązania może w sposób znaczący wpłynąć na wskaźniki SAIFI (wskaźnik przeciętnej, systemowej częstości przerw) oraz wskaźnik SAIDI (wskaźnik przeciętnego, systemowego czasu trwania przerwy), będące wyznacznikiem ewentualnej premii/kary dla OSD według obecnego prawodawstwa. Zgodnie z art. 25 rozporządzenia KE nr 651/2014 z dnia 17 czerwca 2014 r. uznające niektóre rodzaje pomocy za zgodne z rynkiem wewnętrznym w stosowaniu art. 107 i 108 Traktatu (Dz. Urz. UE L 187/1 z 26.06.2014). (Polish)
    0 references
    The aim of the project is to develop a modular set of devices to reduce the electricity supply to final customers.The proposed solution (SBZO) will maximise the continuity of electricity supply both during the planned renovation works related to the upgrading of the infrastructure of the distribution network, as well as during the work related to the removal of the accident.The main elements of the agreement are as follows:separate SN/NN transformers and connection system (module 1), the converter system and the energy battery (module 2), power generators (module 3).In view of the use of modern technological solutions, i.e. high power inverters, energy storage reservoir, network synchronisation, and voltage (PPN) connections, it will be possible to shut down the supply from the SBZO distribution network and vice versa, as well as the reserve supply to a large amount of customers in that audience, which is not in a calm manner, while preserving the selectivity of the security features.This solution is addressed to the Distribution Network Operators (DSOs).Work on the above issues is motivated by the need to implement important elements of the distribution companies’ strategies, which stem inter alia from the need to comply with existing legal acts.The implementation of this solution is likely to significantly affect the SIFI indicators (average rate, systemic frequency) and the SAII-indicator (average systemic duration, systemic duration of breaks) as a benchmark for a possible bonus/penalty for DSOs under the current legislation.In accordance with Article 25 of Commission Regulation (EC) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in the application of Article 107 and 108 of the Treaty (OJ(OJ LEU L 187/1, 26.06.2014). (English)
    0 references

    Identifiers

    POIR.01.02.00-00-0267/17
    0 references