Construction of biomass heat plants at LESS & ENERGY s.r.o. in Dlouhá Vsi (Q15341)

From EU Knowledge Graph
Revision as of 22:53, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: budget (P474): 520,699.47200000007 euro)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
Construction of biomass heat plants at LESS & ENERGY s.r.o. in Dlouhá Vsi
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    7,810,492.08 Czech koruna
    0 references
    312,419.68 Euro
    10 January 2020
    0 references
    13,017,486.8 Czech koruna
    0 references
    60 percent
    0 references
    21 April 2017
    0 references
    25 April 2018
    0 references
    30 April 2018
    0 references
    LESS & ENERGY s.r.o.
    0 references
    0 references

    49°53'18.89"N, 15°23'7.22"E
    0 references
    28601
    0 references
    V rámci projektu dojde k výstavbě kotelny a instalaci kotle o tepelném výkonu 800 kW. Jako surovina pro tento kotel bude sloužit odpadní hnědá štěpka z procesu odkornění dřevozpracujícího podniku LESS & TIMBER, a.s., který bude zároveň odběratelem vyrobeného tepla. Realizací projektu dojde k výraznému omezení škodlivých emisí do ovzduší. a. (Czech)
    0 references
    The project will build a boiler and installation of a boiler with a heat output of 800 kW. The raw material for this boiler will be waste brown chips from the process of debarking the wood company, LESS & Timer, a.s., which will at the same time be a purchaser of the produced heat. The implementation of the project will lead to a significant reduction of harmful emissions in the air. (English)
    0 references

    Identifiers

    CZ.01.3.09/0.0/0.0/16_130/0009806
    0 references