SZT Optimisation pay out of the Matrix School (Q19093)

From EU Knowledge Graph
Revision as of 21:19, 22 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 38,676.568 euro)
Jump to navigation Jump to search
Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
SZT Optimisation pay out of the Matrix School
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    966,914.2 Czech koruna
    0 references
    2,417,285.5 Czech koruna
    0 references
    96,691.42 Euro
    10 January 2020
    0 references
    40 percent
    0 references
    30 September 2020
    0 references
    Teplárna České Budějovice, a.s.
    0 references

    48°57'40.28"N, 14°27'20.84"E
    0 references
    37001
    0 references
    Předmětem projektu je optimalizace parovdou v ulici Matice školské a E. Pittera. Dojde k vybudování cca 172 metrů nové přípojky pro napojení objektů. a. (Czech)
    0 references
    The project aims at optimising the Palaetic School and E. Pitter Street. Some 172 metres of new connections to the connection of the premises will be built up. (English)
    0 references

    Identifiers

    CZ.01.3.15/0.0/0.0/18_188/0016622
    0 references