The renovation of the monumental stony at ul. 1 May 11 in Olsztyn through renovation (Q132710)

From EU Knowledge Graph
Revision as of 13:36, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 180,352.9968 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
The renovation of the monumental stony at ul. 1 May 11 in Olsztyn through renovation
Project in Poland financed by DG Regio

    Statements

    0 references
    751,470.82 zloty
    0 references
    1,130,014.32 zloty
    0 references
    271,203.44 Euro
    13 January 2020
    0 references
    66.5 percent
    0 references
    3 January 2014
    0 references
    31 December 2020
    0 references
    WSPÓLNOTA MIESZKANIOWA NIERUCHOMOŚCI 10-117 OLSZTYN, UL. 1 MAJA 11
    0 references
    0 references

    53°46'36.1"N, 20°28'40.1"E
    0 references
    Zakres proj. obejmuje 1 budynek wielorodz. położ. w Olsztynie przy ul. 1 Maja 11 o łącznej pow. użyt. 1024,78 m2. Budynek wpisany do rej. zabytków pod nr : A-1818. W wybranym do realiz. wariancie stanow. przedmiot niniejszego projektu nowa jakość budynku oraz przestrz. zostanie uzysk. poprzez następ. usprawn.: prace rem-kons elewacji, klatki schod., piwnicy, dachu, stolarki okiennej i drzwiow. klatki schod. i piwnic, wym. inst. wod.-kan. stan. część wspólną oraz przyłącza, inst. domof. z kodem Brailla, ośw. automat., ozn. kontrast., mont. budek ornit. Znaczna poprawa stanu zachow. budynku i jego efektyw. energet. (poprzez inst. czujek oszczędz. en. elektr. w częściach wspól. budynku) oraz estetyki. Zainst. zost. nakł. braile'a na domofon. Więcej w rozdz. 1.1 sw; Interesar. przedm. projektu są mieszkańcy kamienicy, a tym samym obszaru rewit., turyści, służby konserw., Gm. Olsztyn. Szczeg. inform. na temat zakresu rzecz. i przyjętych rozwiąz. znajduje się w rozdz. 2.2 sw. oraz w wyciągu z dokum. techn. będącej załączn. do wniosku. Cały zakres inw. wdraż. będzie przez beneficj., tj. Wsp. Mieszk. Nier. przy ulicy 1 Maja 11, która wraz z podm. współpr. zapewni zespół osób odpow. za wdroż. projektu, którzy posiadają kwalif. i doświad. w realiz. projektów , co potwierdza rozdział 2.4 studium. Projekt po jego zakoń. jednozn. rozw. jeden z istotn. probl. dotycz. najbardz. zniszcz. i zaniedb. infrastr. techn. przy ul. 1 Maja 11 w Olsztynie oraz będzie przeciwdz. margin. znacznych grup mieszk. zdegrad. społecz. i ekon, charakt. się zabytk. zabud. otoczenia. W istotny sposób przyczyni się także do społ. aktyw. mieszk. i wpłynie na obniż. poziomu wyst. zjawisk patol. społ. na danym terenie. Proj. wpis. się w założ. SZOOP RPO WiM 2014-2020, Oś 8 Obsz. wymag. rewit., Cel tem. 9 Prom. Włącz. Społ., walka z ubóstw. i wsz. dysk rym., Prior. Inwest. 9 b – Wsp. rewit. fizycz., gosp. i społ. ubogich społ.na obsz. miejs. i wiejsk., Cel szcz.: Lepsza jak. życia społ. zam. ob. probl. (Polish)
    0 references
    The range of proj consists of 1 multi-family building in Olsztyn, ul. 1 May 11 on the cumulative use of the loan. 1 024.78 m². A building which is included in historic monuments, under the number: A-1818. At the option chosen to implement this project, the new quality of the building and the change will be achieved through the following improvements: the work of the façade, the cage, the roof, the roof, window and door frames and doors for the staircase and the door. A significant improvement in the conservation status of the building and its energy efficiency. (by means of physical savings in the electrical components of the building) and aesthetics. Zainst. Braile to their record-decks. Read more 1.1 sw; The project consists of people living in a stony and in the same area of revitalisation, tourists, canners., Gm. Olsztyn. Specific information on the material scope and solutions adopted. 2.2 pin and in the appendix to the proposal. It will be implemented by the beneficiary. WSP. Bellows. Not done at the street on 1 May 11, which will provide a team for the implementation of the project, who will be qualified and experienced in the project. this is confirmed by chapter 2.4 of the study. Project after the end of the project. In Olsztyn, on 1 May 11, there will be no more than significant groups of residential living, social and environmental degradation, and the natura of indoor environment. It will also make an important contribution to the welfare of residential institutions and to reduce the level of visibility in the area. Take the form. SZOOP ROP WM 2014-2020, Oś 8 Obsz. required to be completed. 9 Prom. Enable. The fight against poverty and racism, Prior. Inwest. 9 b for the physics of the physicist., business and social affairs of the poor. A better quality of life. (English)
    0 references

    Identifiers

    RPWM.08.01.00-28-0002/18
    0 references