Renovation and adaptation to the cultural objectives of the heritage works in the city of Gniezno (Q135081)

From EU Knowledge Graph
Revision as of 23:57, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Renovation and adaptation to the cultural objectives of the heritage works in the city of Gniezno
Project in Poland financed by DG Regio

    Statements

    0 references
    5,443,263.45 zloty
    0 references
    1,306,383.228 Euro
    13 January 2020
    0 references
    6,403,839.37 zloty
    0 references
    1,536,921.45 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    4 May 2016
    0 references
    15 April 2019
    0 references
    MIASTO GNIEZNO
    0 references
    0 references
    Projekt przewiduje kompleksowe prace konserwatorskie, restauratorskie i roboty budowlane, zmierzające do zachowania oraz odtworzenia histor. wartości architek. obiektu wpisanego do rejestru zabytków (NR 26/Wlkp/A), zlokalizowanego w obszarze hist. układu urbanistycznego Gniezna, wpisanego do rejestru zabytków (NR 2523/A).Prace będą dotyczyć:1. Rewitalizacji, rewaloryzacji, konserwacji, renowacji, restauracji, zachowania,adaptacji na c. kulturalne, obiektu: m.in. remont dachu z więźbą dachową, restauracja elewacji z konserwacją wystroju architek. i malowaniem farbami silikatowymi, wykonanie nowych opierzeń blacharskich, rynien i rur spustowych, konserwacja stolarki okiennej i zewn. stolarki drzwiowej wraz z cz. wykonaniem nowej stolarki, remont płyty balkonowej z konserwacją balustrady, przebudowa klatki schodowej, budowa windy i nadbudowa o jedną kondygnację skrzydła (ze względu na szyb windy); modernizacja i restauracja wnętrz, w zw. z ich adaptacją na cele kulturalne- klatki schodowe wraz ze schodami i balustradami, prace konserwatorsko-remontowe we wszystkich pomieszczeniach obejmujące ściany wew., podłogi i posadzki,cz. wykonanie nowej stolarki drzwiowej wew.,wykonanie nowych instalacji wodno-kanalizacyjnych, wentylacyjnej, grzewczej, elektrycznej i teletechnicznej, dostosowanie do potrzeb os. niepełnosprawnych.2. Zakup trwałego wyposażenia (patrz: Studium wykonalności,s 48-50)3. Zabezpieczenie zabytków przed kradzieżą i zniszczeniem (min. in. instalacja sygnalizacji włamania i napadu, instalacja tele. systemu nadzoru, instalacja oddymiania)4.Zagospodarowanie terenu przyległego do Ratusza (m.in. roboty rozbiórkowe, jezdnia, chodniki i tereny zielone, boksy na odpady)W ramach projektu pomieszczenia Ratusza zostaną przebudowane oraz otrzymają nowe funkcje o charakterze kulturalno-edukacyjnym (Patrz Studium s 44-46)Zostaną osiągnięte (2019 r.) wskaźniki produktu: L. zabytków nieruchomych objętych wsparciem- 1, L. obiekt. dostos. do potrzeb os. z niepełnosprawn.-1 (Polish)
    0 references
    The project provides for comprehensive maintenance, restoration and construction works for the maintenance and restoration of the historic value of the structure entered in the Register of Historical Monuments (NR 26/Wlkp/A), located in the area of histocomposition of the municipality of Gniezno, entered in the Register of Historical Monuments (NR 2523/A). the work will relate to: 1. Regeneration, restoration, maintenance, restoration, restoration, maintenance, adaptation to cultural activities, sites: inter alia, the renovation of the roof with the roof of the roof unit, the restoration of the façade with the architecture and painting of silica paints, the construction of blast-plate, guttering and pipes, the maintenance of window frames and door frames, the maintenance of window frames and doors, the renovation of the balcony plate with maintenance of the ballast board, reconstruction of the staircase, reconstruction of the staircase, the construction of the lift and the overconstruction of the wing (because of the elevator shaft); modernisation and home restaurant, in conjunction with their adaptation for cultural purposes, stairways and balustrades, maintenance works in all rooms covering the walls of the weir, floor and floor, part of the new door joinery operation, construction of new water and sewage systems, ventilation, heating, electrical and telecommunications, adaptation to the needs of the disabled. 2. Purchase of equipment (see: Feasibility study, s 48-50) 3. Protection of historic monuments against theft and destruction (inter alia, installation of intrusion and seizure signals, installation of telesurveillance systems, installation of desriding-installation) 4.Management of land adjoining the town (e.g. demolition works, roads, pavements and green areas, boxing on waste). in the frame of the project, the Town Hall will be rebuilt and will receive new cultural and educational functions (See Studium 44-46). (2019) the output indicators are: L. immoveable monuments covered by supportm- 1, L. promised to meet with disabilities -1 (English)
    0 references

    Identifiers

    RPWP.04.04.01-30-0008/16
    0 references