Construction of a building for the Daily Rehabilitation and Physiotherapy Centre and for the Ambulatory Specialist Care Centre (Q132821)

From EU Knowledge Graph
Revision as of 19:27, 15 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a building for the Daily Rehabilitation and Physiotherapy Centre and for the Ambulatory Specialist Care Centre
Project in Poland financed by DG Regio

    Statements

    0 references
    1,684,614.13 zloty
    0 references
    404,307.39119999995 Euro
    13 January 2020
    0 references
    2,082,341.32 zloty
    0 references
    499,761.92 Euro
    13 January 2020
    0 references
    80.9 percent
    0 references
    16 January 2017
    0 references
    2 January 2019
    0 references
    SZPITAL POWIATOWY SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ W PASŁĘKU
    0 references
    0 references

    54°3'45.4"N, 19°39'23.4"E
    0 references
    Projekt polega na budowie nowego budynku na potrzeby Ośrodka Rehabilitacji Dziennej i Fizjoterapii oraz Ambulatoryjnej Opieki Specjalistycznej, w pobliżu dotychczasowego zespołu zabudowy szpitala w Pasłęku. Do budynku zostanie przeniesiony Zakład Rehabilitacji Leczniczej, który aktualnie realizuje świad. w zakresie fizjoterapii. Po zrealizowaniu projektu rozszerzy on swoją działalność o Ośrodek Dzienny Rehabilitacji (nowa usługa - uzupełniająca lukę w syst. zdrowia w powiecie elbląskim), na co pozwoli większa pow. użytk. nowego budynku. Do budynku zostaną przeniesione trzy poradnie specjal. (neurologiczna, gruźlicy i chorób płuc dla dorosłych, zdrowia psychicznego) z budynku oddalonego o 0,5 km i wynajmowanego przez Wnioskodawcę oraz nowo utworzona Poradnia Rehabilitacyjna. Rozwiązanie takie przyczyni się do konsolidacji świadczenia usług zdrow. przez szpital, poprawie ulegnie jakość i dostępność do diagnozy i terapii pacjentów w warunkach ambulatoryjnych. Wybudowany obiekt zabezpieczy całkowicie zapotrzebowanie lokalowe w zakresie rehab. i pozwoli na zwiększenie efektywności i liczby przeprowadzanych zabiegów. Dodatkową korzyścią będzie zwolnienie dotychczas zajmowanych pomieszczeń, które zostaną zagospod. przez Zakład Opiekuńczo-Leczniczy i pozwolą na zwiększenie komfortu pobytu pacjentów ZOL, a nawet na zwiększ. liczby łóżek tym oddziale. Efektem ekonom. będzie spadek stałych kosztów związany z zaprzestaniem wynajmowania pomieszczeń na potrzeby 3 poradni oraz wzrost dochodów związany ze zwiększeniem liczby zabiegów rehab., zakontraktowaniem nowych usług oraz z tytułu zwiększenia liczby pacjentów ZOL. Zostanie zakupiony innowacyjny sprzęt pozwalający zwiększyć jakość świadczonych usług z zakresu rehab. Projekt odpowiada na potrzeby zidentyfikowane na podstawie Map Potrzeb Zdrowotnych dla woj. warm.-maz. Projekt przyczyni się do osiągnięcia rezultatu założonego w SzOOP RPO WiM dla Osi 9 tj. wzrostu liczby korzystających z usług opieki zdrowotnej wysokiej jakości. (Polish)
    0 references
    The project consists of the construction of a new building for the Daily Rehabilitation and Physiotherapy Centre and the Ambulatory Care Facility, close to the existing unit of the hospital at the hospital. The building will be transferred to the plant for the treatment of medicinal products which he is currently performing for physiotherapy. After the implementation of the project, the project will extend its activities to the Centre for Official Rehabilitation (a new service — a bridging gap in health in the district of Elbląg), which will allow the new building to take place. There will be three councillors from the building. (neurological, tuberculosis and lung diseases for adults, mental health) from a building 0.5 km away and rented by the Applicant and a newly created rehabilitation incident. This will contribute to the consolidation of the provision of services by the hospital, improve the quality and availability of outpatient diagnosis and treatment. The built facility will secure all the local needs for the rehab and increase the efficiency and the number of treatments carried out. An additional benefit will be the release of the premises that will be occupied so far, which will be brought to an end by the nursing/medicinal plant and will increase the comfort of the patient’s stay and even the increased number of beds in that branch. As a result, there will be a decrease in the fixed costs associated with the cessation of the rental of premises for 3 advice and an increase in revenues due to the increase in the number of rehab actions, the contracting of new services and the increase in the number of patients of ZOL. Innovative equipment will be purchased to improve the quality of the services provided. The project responds to the needs identified on the basis of the Institute for Health and Health Needs. The project will contribute to the achievement of the desired result of the ROP WiM for Osi 9, i.e. an increase in the number of high-quality healthcare users. (English)
    0 references

    Identifiers

    RPWM.09.01.01-28-0021/17
    0 references