Modernisation of the swimming pool at the Port of Port Schools (ul. Mikołaj 3 in Siemianowice Śląskie) on changing the existing water heating system to the RES system (Q123677)

From EU Knowledge Graph
Revision as of 21:58, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Modernisation of the swimming pool at the Port of Port Schools (ul. Mikołaj 3 in Siemianowice Śląskie) on changing the existing water heating system to the RES system
Project in Poland financed by DG Regio

    Statements

    0 references
    808,365.5 zloty
    0 references
    194,007.72 Euro
    13 January 2020
    0 references
    951,018.23 zloty
    0 references
    228,244.38 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 November 2017
    0 references
    31 March 2018
    0 references
    GMINA SIEMIANOWICE ŚLĄSKIE
    0 references
    0 references

    50°18'46.4"N, 19°1'4.1"E
    0 references
    Przedmiotem projektu jest budowa instalacji solarnej na potrzeby podgrzewu wody basenowej dla Zespołu Szkół Sportowych w Siemianowicach Śląskich, ul. Mikołaja 3 poprzez wspomaganie procesu przygotowania energii cieplnej na basenie za pośrednictwem systemu solarnego, a tym samym częściowe zastąpienie energii pozyskiwanej ze źródeł konwencjonalnych – w tym przypadku z miejskiej sieci ciepłowniczej - energią słoneczną pozyskiwaną przez system solarny. Tak pozyskana energia będzie wykorzystywana do podgrzewania wody zgromadzonej w projektowanych buforach systemu solarnego, zasilającej system podgrzewu wody basenowej. Projektowany system solarny będzie zasilany przez 22 kolektory słoneczne podzielonych na 4 baterie: 2 x 6 i 2 x 5 kolektorów, kolektory wielkopowierzchniowe o powierzchni jednostkowej absorbera 4,71m2 i całkowitej powierzchni czynnej 103,62m2. Kolektory słoneczne zostaną rozmieszczone na konstrukcji wsporczej poza budynkiem. (Polish)
    0 references
    The object of the project is the construction of a solar installation for the purpose of a swimming pool for a swimming pool of the Port of Siemianowice Śląskie, ul. Mikołaj 3, by supporting the process of producing heat in a basin via a solar basin, thus partly replacing conventional energy — in this case, from the district heating network — solar energy sourced by the solar system. The resulting energy will be used to heat the water collected in the design of the solar system to the heat supply system of the swimming pool. The projected solar system will run by 22 solar collectors divided into 4 batteries: 2 x 6 and 2 x 5 collectors, large-surface collectors with a surface area of 4.71 m² and a total active area of 103.62 m². The solar collectors will be located on the support outside the building. (English)
    0 references

    Identifiers

    RPSL.04.01.01-24-0299/16
    0 references