“Construction of a sewerage system with connections to the villages: Bacard, Maćkowice, Kosice, with the extension and alteration of a waste water treatment plant in the Orzachowice area’ (Q118920)

From EU Knowledge Graph
Revision as of 10:49, 24 September 2020 by DG Regio (talk | contribs) (‎Removed claim: EU contribution (P835): 1,848,953.496 euro)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a sewerage system with connections to the villages: Bacard, Maćkowice, Kosice, with the extension and alteration of a waste water treatment plant in the Orzachowice area’
Project in Poland financed by DG Regio

    Statements

    0 references
    7,703,972.9 zloty
    0 references
    9,063,497.53 zloty
    0 references
    2,175,239.41 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    26 August 2016
    0 references
    30 September 2018
    0 references
    GMINA ŻURAWICA
    0 references
    Celem głównym projektu jest uporządkowanie gospodarki ściekowej gminy, ograniczenie zanieczyszczeń przedostających się do środowiska i zapobieganie degradacji środowiska naturalnego. Realizacja projektu wpłynie na zwiększenie dostępności do sieci kanalizacyjnej, podniesienie standardu życia na terenie aglomeracji Orzechowce oraz podniesienie atrakcyjności inwestycyjnej i rozwój turystyki na terenie gminy. Przedmiotem projektu jest budowa sieci kanalizacji sanitarnej w miej.: Batycze, Maćkowice i Kosienice oraz rozbudowa i przebudowa oczyszczalni ścieków w miej.i Orzechowce na terenie gminy Żurawica. Zakres inwestycji w miejscowościach Batycze, Maćkowice i Kosienice obejmuje budowę sieci kanalizacji sanitarnej typu ciśnieniowo-grawitacyjnego wraz z przyłączami do budynków. Zaprojektowane układy sieci będą umożliwiały odprowadzanie ścieków z posesji zlokalizowanych w w/w miejscowościach, których odbiornikiem będzie istniejąca oczyszczalnia ścieków w Orzechowcach. Na odcinkach, gdzie rzeźba terenu nie pozwala na grawitacyjny przepływ ścieków zlokalizowane będą przepompownie ścieków. Na zmianach kierunku trasy oraz załamaniach kanalizacji grawitacyjnej zaprojektowano studzienki rewizyjne, a w przypadku kanalizacji ciśnieniowej w najwyższych punktach studzienki odpowietrzające a najniższych studzienki odwadniające. Kanalizacja będzie wykonywana z materiałów atestowanych oraz dopuszczonych do stosowania w budownictwie. W ramach projektu zostanie wybudowanych 22,42 km kan. sanitarnej i wykonane 225 przyłączy do budynków. Zakres inwestycji w oczyszczalni ścieków obejmuje modernizację i przebudowę budynku technologicznego z zapleczem socjalnym, likwidację istniejących komór fermentacyjnych i poletek do osuszania osadu oraz budowę zbiornika retencyjnego, reaktora biologicznego, komory pomiarowej, stanowiska zlewnego, wiaty i altany śmietnikowej. Docelowe parametry oczyszczalni: Qdśr = 450,0 m3/d, Qdmax = 630,0 m3/d, RLM = 3 400. (Polish)
    0 references
    The main aim of the project is to order the wastewater management of the municipality, reduce pollution crossing environment and prevent environmental degradation. The implementation of the project will increase the accessibility to the sewage system, increase the standard of living in the Orzachowka agglomeration and increase the attractiveness of investment and the development of tourism in the territory of the municipality. The subject of the project is the construction of a sewerage network in field: Bacard, Maćkowice and Kosienice, and the extension and reconstruction of the waste water treatment plant in the area and in the case of a case in the municipality of Zurawica. The range of investments in Basae, Maćkowice and Kosieice consists of the construction of a gravity sewer network, including the connection to buildings. The network systems designed to allow the discharge of waste water from sessions located in the locations where the existing waste water treatment plant is to be delivered in the Orzechowska. On the sections where the relief of the site does not allow the gravity of the waste water to flow, the waste water pumping station will be located. Revisions to the route and to the gravity of the sewerage system have been designed and, in the case of the pressure sewage system, vent wells with the lowest wells of the wells. The sewage system will be carried out from certified materials and will be used in construction. The project will bring 22.42 km of sanitary and 225 km of connections to the buildings. The scope of the investment in the waste water treatment plant covers the modernisation and reconstruction of the technological building with the social facilities, the decommissioning of the existing digesters and sludge drainage systems and the construction of a retention reservoir, a biological reactor, a measurement enclosure, a water catchment area, a wind station, a wind farm and a whipped cream. Target parameters of the treatment plant: Qdder = 450.0 m³/d, Qdmax = 630.0 m³/d, p.e. = 3 400. (English)
    0 references

    Identifiers

    RPPK.04.03.01-18-0027/16
    0 references