Construction of a mechanical and biological waste water treatment plant in Błiu, together with the construction of a sanitary sewage system in Podle, Gmina Prucław (Q118890)

From EU Knowledge Graph
Revision as of 21:01, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Construction of a mechanical and biological waste water treatment plant in Błiu, together with the construction of a sanitary sewage system in Podle, Gmina Prucław
Project in Poland financed by DG Regio

    Statements

    0 references
    6,233,533.09 zloty
    0 references
    1,496,047.9416 Euro
    13 January 2020
    0 references
    7,333,568.36 zloty
    0 references
    1,760,056.41 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    2 June 2016
    0 references
    15 February 2018
    0 references
    GMINA PRZECŁAW
    0 references
    Przedmiotem projektu jest budowa mechaniczno-biologicznej oczyszczalni ścieków w miejscowości Błonie oraz budowa kanalizacji sanitarnej w miejscowości Podole. Błonie i Podole to dwie z pośród 10 wsi, które łącznie z miastem Przecław stanowią Gminę Przecław. Położone są one na terenie Aglomeracji Przecław. Niski poziom skanalizowania gminy–(32,3% w gminie gdy w województwie 68,7%) będący przyczyną wielu zagrożeń dla środowiska naturalnego i mieszkańców niesie za sobą konieczność dalszego procesu kanalizacji gminy. Brak jednak takiej możliwości ze względu na stan techniczny istniejącej oczyszczalni ścieków i jej przepustowość. Istniejąca oczyszczalnia obsługująca całą aglomerację Przecław nie dotrzymuje standardów określonych w Dyrektywie Rady z dnia 21 maja 1991 r. dotyczącej oczyszczania ścieków komunalnych. Problemy te zostaną rozwiązane przez realizację niniejszego projektu. Jego głównym celem jest zapewnienie oczyszczania ścieków komunalnych w aglomeracji Przecław zgodnie z wymogami Dyrektywy 91/271/EWG oraz zwiększenie dostępności do systemu kanalizacji zbiorczej w aglomeracji Przecław przede wszystkim w miejscowości Podole. W wyniku realizacji projektu powstanie mechaniczno-biologiczna oczyszczalnia ścieków w Błoniu o przepustowości docelowej 1 010 m3/d. W ramach zadania powstaną 2 reaktory biologiczne, budynek techniczny, zbiornik magazynowy osadu nadmiernego, pompownia ścieków, zbiorniki uśredniające ścieków i osadów dowożonych, studnia pomiarowa, taca najazdowa, stacje: zlewcza i kraty hakowej, budynek na agregat prądotwórczy, śmietnik, fundament pod silos na wapno, studnia wody technologicznej. Nastąpi dostawa technologii i wyposażenia technologicznego wraz z montażem i uruchomieniem oczyszczania ścieków. Oczyszczalnia wyposażona zostanie w niezbędne instalacje. Projekt obejmuje również budowę 8,27 km sieci kanalizacji sanitarnej w Podolu (rejon przepompowni od P4 do P8). Powstanie 5,24 km kolektorów, 1,51 km przyłączy, 1,52 km rurociągów tłocznych. (Polish)
    0 references
    The object of the project is the construction of a mechanical and biological waste water treatment plant in the municipality of Brei and the construction of a sanitary sewage system in the municipality of Podole. The trees and Pools are two of the 10 rural areas which, together with the town of Wreclav, constitute Gmina Prucław. These are located in the Perclav agglomeration. A low level of mine analysis (32.3 % in the municipality when in the province 68.7 %) which causes many risks to the environment and residents entails the need for a further municipal sewerage process. However, this is not possible due to the technical condition of the existing waste water treatment plant and its capacity. The existing treatment plant for the entire agglomeration of Pcławy fails to respect the standards laid down in the Council Directive of 21 May 1991 concerning urban waste water treatment. These problems will be addressed by the project. Its main purpose is to ensure the treatment of urban waste water in the agglomeration of Pucław agglomeration in accordance with the requirements of Directive 91/271/EEC and to increase the accessibility to the collecting system of the agglomeration of Ducklaw agglomeration in the first place in the city of Podole. The project will result in a mechanical and biological waste water treatment plant in Błiu of 1 010 m³/d. as part of the project, 2 biological reactors, the technical building, the storage of excess sludge, the sewage pumping station, the mean sewage and sewage stations to the feeder, the measuring equipment, the stations are: beaker and stopcock, building on the power generator, the cream base, the foundation of the silo on lime, a century of technology. The supply of technology and technology equipment including the installation and operation of waste water treatment will take place. The plant will be equipped with the necessary installations. The project also includes the construction of 8.27 km of sanitary sewerage network in the sub-region (pumping station from P4 to P8). There will be 5.24 km of collectors, 1.51 km of connections, 1.52 km of compressor pipes. (English)
    0 references

    Identifiers

    RPPK.04.03.01-18-0006/16
    0 references