“Construction of a point of separate collection of municipal waste in congestion” (Q109271)

From EU Knowledge Graph
Revision as of 17:04, 16 July 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
“Construction of a point of separate collection of municipal waste in congestion”
Project in Poland financed by DG Regio

    Statements

    0 references
    384,153.6 zloty
    0 references
    92,196.86399999999 Euro
    13 January 2020
    0 references
    480,192.0 zloty
    0 references
    115,246.08 Euro
    13 January 2020
    0 references
    80.0 percent
    0 references
    3 July 2017
    0 references
    30 June 2020
    0 references
    GMINA ZATORY
    0 references
    0 references

    52°36'22.3"N, 21°11'2.0"E
    0 references
    Projekt dotyczy budowy Punktu Selektywnej Zbiórki Odpadów Komunalnych (PSZOK) w miejscowości Zatory. Przedsięwzięcie obejmuje projekt, roboty budowlane, nadzór, zakup wyposażenia PSZOK, a także działania promocyjne związane z projektem. W PSZOK zbieranych będzie 16 frakcji odp. (zgodnych z Katalogiem odpadów - zał. do Regulaminu konkursu): papier, tworzywa sztuczne, szkło, opakowania wielomateriałowe, zmieszane odp. opakowaniowe, przeterminowane leki, chemikalia oraz zanieczyszczone opakowania, zużyte baterie i akumulatory, zużyty sprzęt elektr. i elektron., meble i inne odp. wielkogabarytowe, odp. budowlane i rozbiórkowe, zużyte opony, odp. zielone, odzież i tekstylia inne niż biodegradowalne, popioły, inne odp. nie wymienione wyżej. W PSZOK będzie funkcjonował punkt napraw oraz punkt przyjmowania rzeczy używanych niestanowiących odpadów, celem ponownego użycia. Planowana jest też promocyjna akcja edukacyjna dotycząca selektywnej zbiórki odpadów. Projekt obejmuje 100% mieszkańców gm. Zatory. Zostanie utworzone jedno miejsce pracy. PSZOK otwarty będzie min. 8 godz., 5 dni w tygodniu, w tym sobota, min. do godz. 19:00. W ramach projektu przewiduje się: wykonanie prac związanych z zagospodarowaniem terenu (utwardzenie, organizacja spływu wody, nasadzenia zieleni, wiata pod kontenery otwarte), zakup i ustawienie pojemników i kontenerów na odp., oświetlenie terenu, ogrodzenie, oznakowanie poziome placu, tablice informacyjne i edukacyjne. Dzięki realizacji projektu poprawie ulegnie system gospodarki odpadami w gminie. Planowana inwestycja została wpisana do Planu inwestycyjnego dla województwa mazowieckiego w ramach Planu gospodarki odpadami dla województwa mazowieckiego 2022 i będzie w zachodnim regionie gospodarki odpadami komunalnymi, w którym obecnie nie uwzględniono komponentu dotyczącego termicznego przekształcenia odpadów oraz odzyskiwania energii. (Polish)
    0 references
    The project relates to the construction of a selective municipal waste collection centre (PSZOK) in Zora. The project includes a project, construction works, supervision, the purchase of PSZOK equipment and the promotional activities related to the project. In the PSZOK the 16 fractions will be collected. (in accordance with the Waste Catalogue, as set out in the Annex to the Rules of Procedure): paper, plastic, glass, composite packaging, packaging, out-dated medicines, chemicals and contaminated packaging, waste batteries and accumulators, waste electrical and electrical appliances, furniture and other bulky products, construction and demolition, used tyres, green, clothing and textiles other than biodegradable, ashes, other items not mentioned above. In the SZOK PSZOK, it will operate a point of repair and the point of acceptance of second-hand goods that are not waste, for reuse. A promotional activity for separate collection is also planned. The project covers 100 % of the inhabitants of ZIONs. One job will be created. The PSZOK will be open at least 8 hours, 5 days a week, including Saturday, hours a week. 19: 00. The project provides for: development of site management (paving, organisation of water runoff, planting of green trees, shelters for open containers), purchase and setting of containers and containers for odp, land lighting, fencing, road markings, signs and educational signs. The project will improve the waste management system in the municipality. The planned investment has been included in the investment plan for the Mazowieckie region in the framework of the waste management plan for the Mazowieckie province of 2022 and will be in the western region of the management of municipal waste, where the waste incineration and energy recovery component is currently missing. (English)
    0 references

    Identifiers

    RPMA.05.02.00-14-8804/17
    0 references