Development of expert technology for the diagnosis of energy and industrial structures using a specialised technology platform and adaptive algorithms. (Q107965)

From EU Knowledge Graph
Revision as of 18:39, 22 June 2020 by DG Regio (talk | contribs) (‎Changed an Item)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Development of expert technology for the diagnosis of energy and industrial structures using a specialised technology platform and adaptive algorithms.
Project in Poland financed by DG Regio

    Statements

    0 references
    523,733.86 zloty
    0 references
    125,696.1264 Euro
    13 January 2020
    0 references
    901,595.25 zloty
    0 references
    216,382.86 Euro
    13 January 2020
    0 references
    58.09 percent
    0 references
    1 September 2016
    0 references
    30 September 2018
    0 references
    ENERGODIAGNOSTYKA SP. Z O.O.
    0 references
    0 references

    52°14'1.3"N, 21°4'17.0"E
    0 references
    Głównym celem projektu jest przeprowadzenie prac badawczych (badań przemysłowych i prac rozwojowych) w rezultacie których opracowanych zostanie szereg rozwiązań technologicznych niezbędnych do budowy specjalizowanej platformy technologicznej wykorzystującej algorytmy adaptacyjne i zawierającej trzy kluczowe komponenty umożliwiające zwiększenie szybkości i dokładności badań urządzeń wymiany ciepła metodą prądów wirowych (np. wymiennika, skraplacza, chłodnicy): - moduł archiwizujący, zawierający bazę danych zgromadzonych w trakcie badań oraz moduł raportowania o stanie urządzenia; - moduł zautomatyzowanej i autonomicznej kontroli diagnozowanych elementów; - moduł precyzji pomiaru. Projekt realizowany będzie 24 miesiące, składać się będzie z 7 zadań: Zadanie nr 1 - Opracowanie modelu funkcjonalnego przepływu danych i analizy sygnałów – Badania przemysłowe, realizacja: 3 miesiące, od 01.09.2016 do 30.11.2016 Zadanie nr 2 - Opracowanie modułu analiz danych sygnałowych wykorzystującego bazę danych zarejestrowanych sygnałów oraz adaptacyjne metody analityczne – Badania przemysłowe, realizacja: 3 miesiące, od 01.12.2016 do 28.02.2017 Zadanie nr 3 Opracowanie dedykowanego i specjalizowanego modułu precyzji pomiarowej – Badania przemysłowe; realizacja: 5 miesięcy, od 01.03.2017 do 31.07.2017 Zadanie nr 4 Opracowanie dedykowanego modułu analiz statystycznych – Badania przemysłowe, realizacja: 4 miesiące, od 01.08.2017 do 30.11.2017 Zadanie nr 5 Opracowanie oprogramowania zarządzającego pracą poszczególnych modułów oraz dedykowanej bazy danych do rejestracji sygnałów – Badania rozwojowe, realizacja: 5 miesięcy, od 01.08.2017 do 31.12.2017 Zadanie nr 6 Wykonanie próbek badawczych i wykonanie badań – Badania rozwojowe, realizacja: 5 miesięcy, od 01.12.2017 do 30.04.2018 Zadanie nr 7 Testy finalne opracowanej technologii – Badania rozwojowe, realizacja: 4 miesiące, od 01.05.2018 do 31.08.2018 Po każdym z zadań będzie przygotowywana szczegółowa dokumentacja spraw (Polish)
    0 references
    The main objective of the project is to carry out the research work (industrial research and development) as a result of which a number of technological solutions will be developed for the construction of a specialised technology platform using adaptive algorithms and containing three key components to increase the speed and accuracy of tests of the heat exchange equipment (e.g. exchanger, condenser, condenser): A archiving module, containing a database of the data collected during the tests and a reporting module on the condition of the equipment; A module with automated and autonomous control of the diagnosis of elements; The precision module of the measurement. The project will run for 24 months, and will consist of 7 tasks: Activity 1 — Development of functional data flow and signal analysis model — Industrial research, implementation: 3 months, from 01.09.2016 to 30.11.2016 — Activity No 2 — Development of a signal analysis module using the signal database and adaptive analytical methods — Industrial research, implementation: 3 months, from 01.12.2016 to 28.02.2017 Task No. 3 Development of a dedicated and specialised module of precision testing — Industrial studies; implementation: 5 months, 01.03.2017 to 31.07.2017 Task No. 4 Development of a dedicated module of statistical analysis — Industrial research, implementation: 4 months, from 01.08.2017 to 30.11.2017 Activity No 5 Development of software application management software and a dedicated signal registration database — Development, implementation: 5 months, from 01.08.2017 to 31.12.2017 Activity No 6 The execution of the test samples and the execution of the tests — Research and development, implementation: 5 months, from 01.12.2017 to 30.04.2018 Task No 7, Final technology developed — Development, implementation: 4 months, 01.05.2018 to 31.08.2018 (English)
    0 references

    Identifiers

    RPMA.01.02.00-14-6199/16
    0 references